Determining sequence and ready times in a remanufacturing system

IIE TRANSACTIONS, 38(7), 597–607.

By: P. Stanfield*, R. King n  & T. Hodgson n 

co-author countries: United States of America πŸ‡ΊπŸ‡Έ
Source: Web Of Science
Added: August 6, 2018

A fundamental scheduling problem is to determine a production start (ready) time for jobs based on customer-specified due dates. Typically, the objective is to delay the ready time in an attempt to minimize work-in-process inventory and maximize production system utilization. In many practical situations, notably remanufacturing operations, highly variable operation times and intricate process plans complicate this problem. In such a case, a specific ready time implies a confidence of on-time completion. Prior analytical results imply the optimal solution is a function of: (i) customer due dates; (ii) desired confidence levels; and (iii) stochastic makespan minimization. This paper proposes the use of a network flow model to represent a remanufacturing flowshop and then presents a structured heuristic approach that is able to develop sequences and ready times for remanufacturing systems by balancing the three factors. A broad experimental design is used to demonstrate that the proposed scheduling method outperforms previous list rules in terms of the calculated mean and robustness values.