Works (3)
2012 journal article
Evaluation of On-Site Fuel Use and Emissions over the Duration of a Commercial Building Project
JOURNAL OF INFRASTRUCTURE SYSTEMS, 18(2), 119–129.
Contributors: W. Rasdorf n
2012 journal article
Preliminary Engineering Cost Estimation Model for Bridge Projects
Journal of Construction Engineering and Management, 139(9), 1259–1267.
2010 conference paper
Development of a regression model to predict preliminary engineering costs
ITE 2010 Technical Conference and Exhibit compendium of technical papers. Washington, D.C. : Institute of Transportation Engineers.