Works (3)

Updated: July 5th, 2023 15:45

2013 journal article

Preliminary Engineering Cost Estimation Model for Bridge Projects

Journal of Construction Engineering and Management, 139(9), 1259–1267.

By: D. Hollar*, W. Rasdorf n, M. Liu n, J. Hummer n, I. Arocho n & S. Hsiang*

author keywords: Construction management; Infrastructure; Bridges; Construction costs; Budgets; Preliminary engineering; Preconstruction; Infrastructure; Bridges; Cost estimation; Regression; Planning; Design; Budget control; Project planning and design
Sources: Web Of Science, Crossref
Added: August 6, 2018

2012 journal article

Evaluation of On-Site Fuel Use and Emissions over the Duration of a Commercial Building Project

JOURNAL OF INFRASTRUCTURE SYSTEMS, 18(2), 119–129.

By: W. Rasdorf n, P. Lewis*, S. Marshall n, I. Arocho n & H. Frey n

author keywords: Air pollution; Construction equipment; Engines; Emissions; Resource allocation; Pollutants; Project management; Fuel consumption; Commercial buildings
Sources: Web Of Science, ORCID
Added: August 6, 2018

2010 conference paper

Development of a regression model to predict preliminary engineering costs

ITE 2010 Technical Conference and Exhibit compendium of technical papers. Washington, D.C. : Institute of Transportation Engineers.

By: D. Hollar, I. Arocho, J. Hummer, M. Liu & W. Rasdorf

Source: NC State University Libraries
Added: August 6, 2018