@inproceedings{king_moon_1999, title={Quick response replenishment: A case study}, volume={2}, DOI={10.1109/wsc.1999.816863}, abstractNote={We document a case study based upon an ongoing analysis for a U.S. fiber/fabric manufacturer who is expanding its operations vertically to include cut and sew operations in Mexico. We refer to this vertically integrated manufacturer as VIM. While some of the data have been changed to protect the sources, the story and results themselves are unchanged. More detail on this case can be found in Moon (1999).}, booktitle={1999 Winter Simulation Conference: proceedings: Pointe Hilton Squaw Peak Resort, Phoenix, AZ, U.S.A., 5-8 December 1999}, publisher={Piscataway, New Jersey: IEEE; New York, NY: Association for Computing Machinery ; San Diego, California: Society for Computer Simulation International}, author={King, Russell and Moon, K.}, year={1999}, pages={1341–1349} }