Girish Ramachandra Ramachandra, G., & Elmaghraby, S. E. (2006). Sequencing precedence-related jobs on two machines to minimize the weighted completion time. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 100(1), 44–58. https://doi.org/10.1016/j.ijpe.2004.10.014