Works (11)
2023 conference paper
NUMERICAL COMPARISON OF LONG-STEP INTERIOR POINT ALGORITHMS FOR SOLVING LINEAR COMPLEMENTARITY PROBLEMS
Proceedings of the 17th International Symposium on Operational Research in Slovenia, SOR 2023, 411–414. http://www.scopus.com/inward/record.url?eid=2-s2.0-85179517437&partnerID=MN8TOARS
2023 journal article
Sufficient Matrices: Properties, Generating and Testing
Journal of Optimization Theory and Applications, 202(1), 204–236.
Contributors: M. E.-Nagy *, T. Illés *, J. Povh *, * & J. Žerovnik *
2022 journal article
A New Ai–Zhang Type Interior Point Algorithm for Sufficient Linear Complementarity Problems
Journal of Optimization Theory and Applications, 202(1), 76–107.
Contributors: M. E.-Nagy * & *
2022 journal article
A new long-step interior point algorithm for linear programming based on the algebraic equivalent transformation
Central European Journal of Operations Research, 31(3), 691–711.
Contributors: M. E.-Nagy * & *
2022 thesis
New Ai-Zhang type long-step interior point algorithms using the algebraically equivalent transformation technique
Budapest University of Technology and Economics (Hungary).
2021 conference paper
A NUMERICAL COMPARISON OF LONG-STEP INTERIOR POINT ALGORITHMS FOR LINEAR OPTIMIZATION
Proceedings of the 16th International Symposium on Operational Research in Slovenia, SOR 2021, 75–80. http://www.scopus.com/inward/record.url?eid=2-s2.0-85125174431&partnerID=MN8TOARS
2018 journal article
An estimation of the learning curve effect on project duration with Monte Carlo simulation
Periodica Polytechnica Architecture, 49(1), 66–71.
2018 journal article
Integrating combinatorial algorithms into a linear programming solver
Central European Journal of Operations Research, 27(2), 475–482.
Contributors: R. Molnár-Szipai * & *
2017 conference paper
An Estimation of the Learning Curve Effect on Project Scheduling with Calendar Days Calculation
Procedia Engineering, 196, 730–737.
2017 conference paper
An Estimation of the Learning Effect on Project Cost Scheduling
Procedia Engineering, 196, 723–729.
2016 journal article
An estimation of the learning curve effect on project scheduling with working days calculation
Periodica Polytechnica Architecture, 47(2), 104–109.
Employment
Updated: November 20th, 2024 14:17
2024 - present
2023 - 2024
2023 - 2023
2022 - 2023
Education
Updated: January 29th, 2024 15:11
2018 - 2022