Gongfan Chen Chen, G., Liu, M., Li, H., Hsiang, S. M., & Jarvamard, A. (2023). Motivating Reliable Collaboration for Modular Construction: Shapley Value-Based Smart Contract. JOURNAL OF MANAGEMENT IN ENGINEERING, 39(6). https://doi.org/10.1061/JMENEA.MEENG-5428 Li, H., Chen, G., Liu, M., Hsiang, S. M., & Jarvamardi, A. (2023). Situation Awareness Based Smart Contract for Modular Construction. In Lecture Notes in Civil Engineering (pp. 363–373). https://doi.org/10.1007/978-981-19-1029-6_28 He, C., Liu, M., Zhang, Y., Wang, Z., Hsiang, S. M. M., Chen, G., … Dai, G. (2023). Space-Time-Workforce Visualization and Conditional Capacity Synthesis in Uncertainty. JOURNAL OF MANAGEMENT IN ENGINEERING, 39(2). https://doi.org/10.1061/JMENEA.MEENG-4991 Chen, G., Liu, M., Zhang, Y. X., Wang, Z. G., Hsiang, S. M., & He, C. (2023). Using Images to Detect, Plan, Analyze, and Coordinate a Smart Contract in Construction. JOURNAL OF MANAGEMENT IN ENGINEERING, 39(2). https://doi.org/10.1061/JMENEA.MEENG-5121 He, C., Liu, M., Zhang, Y. X., Wang, Z., Hsiang, S. M., Chen, G., & Chen, J. (2022). Exploit Social Distancing in Construction Scheduling: Visualize and Optimize Space-Time-Workforce Tradeoff. JOURNAL OF MANAGEMENT IN ENGINEERING, 38(4). https://doi.org/10.1061/(ASCE)ME.1943-5479.0001037 Facilitating Smart Contract in Project Scheduling under Uncertainty-A Choquet Integral Approach. (2022). Construction Research Congress: Computer Applications, Automation, and Data Analytics. Retrieved from https://publons.com/wos-op/publon/61520141/ Chen, G., Li, H., Liu, M., Hsiang, S. M., & Jarvamardi, A. (2022, June 29). Knowing what is going on--a smart contract for modular construction. CANADIAN JOURNAL OF CIVIL ENGINEERING, Vol. 6. https://doi.org/10.1139/cjce-2021-0649