Works (34)

2018 journal article

A Military Logistics Network Planning System

Military Operations Research, 23(4), 5–24.

By: M. Rogers, B. McConnell, T. Hodgson, M. Kay, R. King, G. Parlier, K. Thoney Barletta

Source: NC State University Libraries
Added: January 31, 2019

2017 journal article

Allocation heuristics for high-altitude long- endurance UAV image intelligence platforms

Military Operations Research, 22(3), 5–19.

By: G. Kim, T. Hodgson, R. King, Y. Liu & M. Kay

Source: NC State University Libraries
Added: August 6, 2018

2017 journal article

Heuristic inventory policies for a hybrid manufacturing/remanufacturing system with product substitution

Computers & Industrial Engineering, 114, 206–222.

By: S. Ahiska, F. Gocer & R. King

Source: NC State University Libraries
Added: August 6, 2018

2016 conference paper

Supply chain operations reference model for us based powder bed metal additive manufacturing processes

In 2016 winter simulation conference (wsc) (pp. 1158–1169).

By: S. Shouche, R. Wysk, R. King & O. Harrysson

Source: NC State University Libraries
Added: August 6, 2018

2015 conference paper

Analysis of a downward substitution strategy in a manufacturing/remanufacturing system

In Operations research and enterprise systems, icores 2014 (Vol. 509, pp. 186–198).

By: F. Gocer, S. Ahiska & R. King

Source: NC State University Libraries
Added: August 6, 2018

2015 journal article

Inventory policy characterisation methodologies for a single-product recoverable manufacturing system

European Journal of Industrial Engineering, 9(2), 222–243.

By: S. Ahiska & R. King

Source: NC State University Libraries
Added: August 6, 2018

2015 journal article

On the economic lot scheduling problem: Stock-out prevention and system feasibility

International Journal of Production Research, 53(16), 4903–4916.

By: B. Hanson, T. Hodgson, M. Kay, R. King & K. Thoney-Barletta

Source: NC State University Libraries
Added: August 6, 2018

2015 chapter

Reverse logistics of US carpet recycling

In Sustainable Fashion Supply Chain Management (pp. 3–30). Cham: Springer,

By: I. Sas, K. Thoney, J. Joines, R. King & R. Woolard

Source: NC State University Libraries
Added: November 7, 2018

2014 journal article

Combined DES/SD model of breast cancer screening for older women, II: screening-and-treatment simulation

IIE Transactions, 46(7), 707–727.

By: J. Tejada, J. Ivy, R. King, J. Wilson, M. Ballan, M. Kay, K. Diehl, B. Yankaskas

Source: NC State University Libraries
Added: August 6, 2018

2013 journal article

A A Markov decision process-based policy characterization approach for a stochastic inventory control problem with unreliable sourcing

International Journal of Production Economics, 144(2), 485–496.

By: S. Ahiska, S. Appaji, R. King & D. Warsing

Source: NC State University Libraries
Added: August 6, 2018

2013 journal article

An An effective lower bound on L-max in a worker-constrained job shop

Computers & Operations Research, 40(1), 328–343.

By: B. Lobo, T. Hodgson, R. King, K. Thoney & J. Wilson

Source: NC State University Libraries
Added: August 6, 2018

2011 journal article

Information sharing in capacity constrained supply chains under lost sales

International Journal of Production Research, 49(24), 7469–7491.

By: L. Davis, R. King, T. Hodgson & W. Wei

Source: NC State University Libraries
Added: August 6, 2018

2010 journal article

Inventory optimization in a one product recoverable manufacturing system

International Journal of Production Economics, 124(1), 11–19.

By: S. Ahiska & R. King

Source: NC State University Libraries
Added: August 6, 2018

2010 journal article

Life cycle inventory policy characterizations for a single-product recoverable system

International Journal of Production Economics, 124(1), 51–61.

By: S. Ahiska & R. King

Source: NC State University Libraries
Added: August 6, 2018

2009 journal article

Technical note: A computationally efficient algorithm for undiscounted Markov decision processes with restricted observations

Naval Research Logistics, 56(1), 86–92.

By: L. Davis, T. Hodgson, R. King & W. Wei

Source: NC State University Libraries
Added: August 6, 2018

2008 conference paper

A A simulation-based approach for inventory modeling of perishable pharmaceuticals

In 2008 Winter Simulation Conference, vols 1-5 (pp. 1532–1538).

By: A. Vila-Parrish, J. Ivy & R. King

Source: NC State University Libraries
Added: August 6, 2018

2008 conference paper

Heuristics for balancing operating room and post-anesthesia resources under uncertainty

In 2008 Winter Simulation Conference, vols 1-5 (pp. 1601–1608).

By: J. Iser, B. Denton & R. King

Source: NC State University Libraries
Added: August 6, 2018

2007 journal article

Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structure

Computers & Industrial Engineering, 52(1), 57–70.

By: M. Taner, T. Hodgson, R. King & S. Schultz

Source: NC State University Libraries
Added: August 6, 2018

2006 journal article

Determining sequence and ready times in a remanufacturing system

IIE Transactions, 38(7), 597–607.

By: P. Stanfield, R. King & T. Hodgson

Source: NC State University Libraries
Added: August 6, 2018

2004 journal article

Case study on statistically estimating minimum makespan for flow line scheduling problems

European Journal of Operational Research, 155(2), 439–454.

By: A. Wilson, R. King & J. Wilson

Source: NC State University Libraries
Added: August 6, 2018

2004 journal article

Minimizing L-max for large-scale, job-shop scheduling problems

International Journal of Production Research, 42(23), 4893–4907.

By: S. Schultz, T. Hodgson, R. King & K. Thoney

Source: NC State University Libraries
Added: August 6, 2018

2004 journal article

Minimizing L-max for the single machine scheduling problem with family set-ups

International Journal of Production Research, 42(20), 4315–4330.

By: S. Schultz, T. Hodgson, R. King & M. Taner

Source: NC State University Libraries
Added: August 6, 2018

2004 journal article

Scheduling non-similar groups on a flow line: multiple group setups

Robotics and Computer-Integrated Manufacturing, 20(6), 505–515.

By: A. Wilson, R. King & T. Hodgson

Source: NC State University Libraries
Added: August 6, 2018

2003 journal article

Integrated job release and shop-floor scheduling to minimize WIP and meet due-dates

International Journal of Production Research, 41(1), 31–45.

By: A. Zozom, T. Hodgson, R. King, A. Weintraub & D. Cormier

Source: NC State University Libraries
Added: August 6, 2018

2003 journal article

Satisfying due-dates in a job shop with sequence-dependent family set-ups

International Journal of Production Research, 41(17), 4153–4169.

By: M. Taner, T. Hodgson, R. King & K. Thoney

Source: NC State University Libraries
Added: August 6, 2018

2002 journal article

Satisfying due-dates in large multi-factory supply chains

IIE Transactions, 34(9), 803–811.

By: K. Thoney, T. Hodgson, R. King, M. Taner & A. Wilson

Source: NC State University Libraries
Added: August 6, 2018

2000 journal article

Simulation Modeling of the textile supply chain - Part 1: The textile-plant models

Journal of the Textile Institute, 91(1), 35–50.

By: H. Nuttle, R. King, N. Hunter, J. Wilson & S. Fang

Source: NC State University Libraries
Added: August 6, 2018

2000 journal article

Simulation Modeling of the textile supply chain - Part II: Results and research directions

Journal of the Textile Institute, 91(1), 51–64.

By: H. Nuttle, R. King, S. Fang, J. Wilson & N. Hunter

Source: NC State University Libraries
Added: August 6, 2018

1999 journal article

On satisfying due-dates in large job shops: Idle time insertion

IIE Transactions, 32(2), 177–180.

By: T. Hodgson, R. King, K. Thoney, N. Stanislaw, A. Weintraub & A. Zozom

Source: NC State University Libraries
Added: August 6, 2018

1999 conference paper

Quick response replenishment: A case study

In 1999 Winter Simulation Conference: proceedings: Pointe Hilton Squaw Peak Resort, Phoenix, AZ, U.S.A., 5-8 December 1999 (Vol. 2, pp. 1341–1349). Piscataway, New Jersey: IEEE; New York, NY: Association for Computing Machinery ; San Diego, California: Society for Computer Simulation International.

By: R. King & K. Moon

Source: NC State University Libraries
Added: August 6, 2018

1999 journal article

Scheduling with alternatives: a link between process planning and scheduling

IIE Transactions, 31(11), 1093–1102.

By: A. Weintraub, D. Cormier, T. Hodgson, R. King, J. Wilson & A. Zozom

Source: NC State University Libraries
Added: August 6, 2018

1998 journal article

Decision support system for lumber procurement and dry kiln scheduling

Forest Products Journal, 48(9), 51–59.

By: J. Huang, C. Culbreth, J. Joines, R. King & T. Hodgson

Source: NC State University Libraries
Added: August 6, 2018

1997 conference paper

A fuzzy-control-based quick response reorder scheme for retailing of seasonal apparel

In Joint Conference of Information Sciences: Semiotics, fuzzy logic, soft computing, computer vision, neural computing, genetic algorithm, pattern recognition, evolutionary computing (Vol. 2, pp. 300–303). Durham, NC: Duke University Machine Intelligence & Fuzzy Logic Laboratory.

By: S. Fang, T. Chen, H. Nuttle & R. King

Source: NC State University Libraries
Added: August 6, 2018

1997 journal article

Ready time scheduling with stochastic service times

Operations Research, 45(5), 779–783.

By: T. Hodgson, R. King & P. Stanfield

Source: NC State University Libraries
Added: August 6, 2018