Min Liu Bonilla, M., Rasdorf, W., Liu, M., Al-Ghandour, M., & He, C. (2023). Inequity Reduction in Road Maintenance Funding for Municipalities. PUBLIC WORKS MANAGEMENT & POLICY, 28(3), 339–362. https://doi.org/10.1177/1087724X221130047 Chen, G., Liu, M., Li, H., Hsiang, S. M., & Jarvamard, A. (2023). Motivating Reliable Collaboration for Modular Construction: Shapley Value-Based Smart Contract. JOURNAL OF MANAGEMENT IN ENGINEERING, 39(6). https://doi.org/10.1061/JMENEA.MEENG-5428 He, C., Liu, M., Zhang, Y., Wang, Z., Hsiang, S. M. M., Chen, G., … Dai, G. (2023). Space-Time-Workforce Visualization and Conditional Capacity Synthesis in Uncertainty. JOURNAL OF MANAGEMENT IN ENGINEERING, 39(2). https://doi.org/10.1061/JMENEA.MEENG-4991 Bonilla, M., Rasdorf, W., Liu, M., Al-Ghandour, M., & He, C. (2022, September 27). Inequity Reduction in Road Maintenance Funding for Municipalities. PUBLIC WORKS MANAGEMENT & POLICY, Vol. 9. https://doi.org/10.1177/I087724X221130047 Liu, Y. C., Jarvamardi, A., Zhang, Y. X., Liu, M., Hsiang, S. M., Yang, S. J., … Jiang, Z. H. (2021). Comparative Study on Perception of Causes for Construction Task Delay in China and the United States. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 147(3). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001985 McCoy, B. C., Bourara, Z., Lucier, G. W., Seracino, R., Liu, M., & Lin, S.-H. (2021). Prestressed MF-FRP: Experimental Study of Rapid Retrofit Solution for Deteriorated Prestressed C-Channel Beams. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 35(1). https://doi.org/10.1061/(ASCE)CF.1943-5509.0001536 Zhang, Y. X., Javanmardi, A., Liu, Y. C., Yang, S. J., Yu, X. X., Hsiang, S. M., … Liu, M. (2020). How Does Experience with Delay Shape Managers' Making-Do Decision: Random Forest Approach. JOURNAL OF MANAGEMENT IN ENGINEERING, 36(4). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000776 Javanmardi, A., Abbasian-Hosseini, S. A., Liu, M., & Hsiang, S. M. (2020). Improving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 146(4). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001790 Alves, T. da C. L., Liu, M., Scala, N. M., & Javanmardi, A. (2020). Schedules and Schedulers: A Study in the US Construction Industry. ENGINEERING MANAGEMENT JOURNAL, 32(3), 166–185. https://doi.org/10.1080/10429247.2020.1738878 Olivieri, H., Seppanen, O., Alves, T. da C. L., Scala, N. M., Schiavone, V., Liu, M., & Granja, A. D. (2019). Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 145(12). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001644 Javanmardi, A., Abbasian-Hosseini, S. A., Liu, M., & Hsiang, S. M. (2018). Benefit of Cooperation among Subcontractors in Performing High-Reliable Planning. JOURNAL OF MANAGEMENT IN ENGINEERING, 34(2). https://doi.org/10.1061/(asce)me.1943-5479.0000578 Javanmardi, A., Hsiang, S. M., & Liu, M. (2018). Effects of General Contractor’s Loading Strategies on Project and Trades’ Performance. Construction Research Congress 2018. Presented at the Construction Research Congress 2018. https://doi.org/10.1061/9780784481271.044 Abbasian-Hosseini, S. A., Liu, M., & Howell, G. (2018). Investigating the Cost-Benefit Trade-Off of Additional Planning Using Parade Game Simulation. JOURNAL OF MANAGEMENT IN ENGINEERING, 34(2). https://doi.org/10.1061/(asce)me.1943-5479.0000580 Abbsaian-Hosseini, S. A., Liu, M., & Hsiang, S. M. (2017). Social network analysis for construction crews. International Journal of Construction Management, 19(2), 113–127. https://doi.org/10.1080/15623599.2017.1389642 Abbasian-Hosseini, S. A., Liu, M., & Hsiang, S. M. (2017). Social network conformity and construction work plan reliability. AUTOMATION IN CONSTRUCTION, 78, 1–12. https://doi.org/10.1016/j.autcon.2017.01.004 Hajifathalian, K., Howell, G., Wambeke, B. W., Hsiang, S. M., & Liu, M. (2016). "Oops" Simulation: Cost-Benefits Trade-Off Analysis of Reliable Planning for Construction Activities. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 142(8). https://doi.org/10.1061/(asce)co.1943-7862.0001135 Javanmardi, A., Abbasian-Hosseini, S. A., Liu, M., & Hsiang, S. M. (2016). Analysis of Workflow Variability's Impacts on Trade and Project Performance. ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, Vol. 145, pp. 281–287. https://doi.org/10.1016/j.proeng.2016.04.075 Abbasian-Hosseini, S. A., Leming, M. L., & Liu, M. (2016). Effects of Idle Time Restrictions on Excess Pollution from Construction Equipment. Journal of Management in Engineering, 32(2), 04015046. https://doi.org/10.1061/(asce)me.1943-5479.0000408 Russell, M. M., Liu, M., & Hsiang, S. M. (2016). Planning for uncertainty: Use of structural equation modelling to determine the causal structure of time buffer allocation. Construction Management and Economics, 33(10), 783–798. Abbasian-Hosseini, S. A., Howell, G., & Liu, M. (2016, May 24). Relationship between On-Site Planning Efforts and Work Plan Reliability. Presented at the Construction Research Congress 2016, San Juan, Puerto Rico. https://doi.org/10.1061/9780784479827.212 Patanakul, P., Kwak, Y. H., Zwikael, O., & Liu, M. (2016). What impacts the performance of large-scale government projects? INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 34(3), 452–466. https://doi.org/10.1016/j.ijproman.2015.12.001 Russell, M. M., Liu, M., Howell, G., & Hsiang, S. M. (2015). Case Studies of the Allocation and Reduction of Time Buffer through Use of the Last Planner System. Journal of Construction Engineering and Management, 141(2), 04014068. https://doi.org/10.1061/(asce)co.1943-7862.0000900 Abbasian-Hosseini, S. A., Liu, M., & Leming, M. (2015). Comparison of Least-Cost and Least-Pollution Equipment Fleet Configurations Using Computer Simulation. Journal of Management in Engineering, 31(6), 04015003. https://doi.org/10.1061/(asce)me.1943-5479.0000360 Russell, M. M., Hsiang, S. M., Liu, M., & Wambeke, B. (2014). Causes of Time Buffer and Duration Variation in Construction Project Tasks: Comparison of Perception to Reality. Journal of Construction Engineering and Management, 140(6), 04014016. https://doi.org/10.1061/(asce)co.1943-7862.0000819 Kwak, Y., Liu, M., Patanakul, P., & Zwikael, O. (2014). Challenges and Best Practices of Managing Government Projects and Programs. Newtown Square, PA: Project Management Institute Inc. Abbasian-Hosseini, S. A., Hsiang, S. M., Leming, M. L., & Liu, M. (2014). From Social Network to Data Envelopment Analysis: Identifying Benchmarks at the Site Management Level. Journal of Construction Engineering and Management, 140(8), 04014028. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000875 Wambeke, B. W., Liu, M., & Hsiang, S. M. (2014). Task Variation and the Social Network of Construction Trades. Journal of Management in Engineering, 30(4), 05014008. https://doi.org/10.1061/(asce)me.1943-5479.0000219 Russell, M. M., Howell, G., Hsiang, S. M., & Liu, M. (2013). Application of Time Buffers to Construction Project Task Durations. Journal of Construction Engineering and Management, 139(10), 04013008. https://doi.org/10.1061/(asce)co.1943-7862.0000735 Vaughan, J. L., Leming, M. L., Liu, M., & Jaselskis, E. (2013). Cost-Benefit Analysis of Construction Information Management System Implementation: Case Study. Journal of Construction Engineering and Management, 139(4), 445–455. https://doi.org/10.1061/(asce)co.1943-7862.0000611 Hollar, D. A., Rasdorf, W., Liu, M., Hummer, J. E., Arocho, I., & Hsiang, S. M. (2013). Preliminary Engineering Cost Estimation Model for Bridge Projects. Journal of Construction Engineering and Management, 139(9), 1259–1267. https://doi.org/10.1061/(asce)co.1943-7862.0000668 Liu, M., Rasdorf, W., Hummer, J. E., Hollar, D. A., & Parikh, S. C. (2013). Preliminary Engineering Cost-Estimation Strategy Assessment for Roadway Projects. Journal of Management in Engineering, 29(2), 150–157. https://doi.org/10.1061/(asce)me.1943-5479.0000137 Wang, C., Liu, M., Hsiang, S. M., & Leming, M. L. (2012). Causes and Penalties of Variation: Case Study of a Precast Concrete Slab Production Facility. Journal of Construction Engineering and Management, 138(6), 775–785. https://doi.org/10.1061/(asce)co.1943-7862.0000475 Hajifathalian, K., Wambeke, B. W., Liu, M., & Hsiang, S. M. (2012). Effects of Production Control Strategy and Duration Variance on Productivity and Work in Process: Simulation-Based Investigation. Journal of Construction Engineering and Management, 138(9), 1035–1043. https://doi.org/10.1061/(asce)co.1943-7862.0000517 Liu, M., Rasdorf, W., Hollar, D. A., Hummer, J. E., & Parikh, S. C. (2012). Predicting the Preliminary Engineering Duration of Bridge Projects. Construction Research Congress 2012. Presented at the Construction Research Congress 2012, West Lafayette, Indiana. https://doi.org/10.1061/9780784412329.051 Wang, Y., & Liu, M. (2012). Prices of Highway Resurfacing Projects in Economic Downturn: Lessons Learned and Strategies Forward. Journal of Management in Engineering, 28(4), 391–397. https://doi.org/10.1061/(asce)me.1943-5479.0000094 Wambeke, B. W., Liu, M., & Hsiang, S. M. (2012). Using Last Planner and a Risk Assessment Matrix to Reduce Variation in Mechanical Related Construction Tasks. Journal of Construction Engineering and Management, 138(4), 491–498. https://doi.org/10.1061/(asce)co.1943-7862.0000444 Wambeke, B. W., Liu, M., & Hsiang, S. M. (2012). Using Pajek and Centrality Analysis to Identify a Social Network of Construction Trades. Journal of Construction Engineering and Management, 138(10), 1192–1201. https://doi.org/10.1061/(asce)co.1943-7862.0000524 Lai, D. N. C., Liu, M., & Ling, F. Y. Y. (2011). A comparative study on adopting human resource practices for safety management on construction projects in the United States and Singapore. International Journal of Project Management, 29(8), 1018–1032. https://doi.org/10.1016/j.ijproman.2010.11.004 Ibbs, W., & Liu, M. (2011). An improved methodology for selecting similar working days for measured mile analysis. International Journal of Project Management, 29(6), 773–780. https://doi.org/10.1016/j.ijproman.2010.07.006 Wambeke, B. W., Hsiang, S. M., & Liu, M. (2011). Causes of Variation in Construction Project Task Starting Times and Duration. Journal of Construction Engineering and Management, 137(9), 663–677. https://doi.org/10.1061/(asce)co.1943-7862.0000342 Liu, M., Ballard, G., & Ibbs, W. (2011). Work Flow Variation and Labor Productivity: Case Study. Journal of Management in Engineering, 27(4), 236–242. https://doi.org/10.1061/(asce)me.1943-5479.0000056 Wambeke, B., Liu, M., & Hsiang, S. M. (2010). Causes of Variation in Construction Task Starting Times and Duration. Construction Research Congress 2010. Presented at the Construction Research Congress 2010, Banff, Alberta, Canada. https://doi.org/10.1061/41109(373)98 Ling, F. Y. Y., Liu, M., & Woo, Y. C. (2009). Construction fatalities in Singapore. International Journal of Project Management, 27(7), 717–726. https://doi.org/10.1016/j.ijproman.2008.11.002 Yean Yng Ling, F., & Liu, M. (2005). Factors considered by successful and profitable contractors in mark-up size decision in Singapore. Building and Environment, 40(11), 1557–1565. https://doi.org/10.1016/j.buildenv.2004.12.001 Ibbs, W., & Liu, M. (2005). Improved Measured Mile Analysis Technique. Journal of Construction Engineering and Management, 131(12), 1249–1256. https://doi.org/10.1061/(asce)0733-9364(2005)131:12(1249) Liu, M., & Ling, Y. Y. (2005). Modeling a Contractor’s Markup Estimation. Journal of Construction Engineering and Management, 131(4), 391–399. https://doi.org/10.1061/(asce)0733-9364(2005)131:4(391) Ibbs, W., & Liu, M. (2005). System Dynamic Modeling of Delay and Disruption Claims. AACE Cost Engineering, 47(6), 12–15. Ling, F. Y. Y., & Liu, M. (2004). Using neural network to predict performance of design-build projects in Singapore. Building and Environment, 39(10), 1263–1274. https://doi.org/10.1016/j.buildenv.2004.02.008 Liu, M., & Ling, Y. Y. (2003). Using fuzzy neural network approach to estimate contractors’ markup. Building and Environment, 38(11), 1303–1308. https://doi.org/10.1016/s0360-1323(03)00135-5 Zhao, P., Liu, M., & Xie, X. H. (1998). Computer Simulation for Construction Project Investment Decision. Journal of Xi’an University of Architecture and Technology, 30(3), 290–293.