@article{pei_liu_pardalos_fan_yang_2017, title={Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times}, volume={249}, number={1-2}, journal={Annals of Operations Research}, author={Pei, J. and Liu, X. B. and Pardalos, P. M. and Fan, W. J. and Yang, S. L.}, year={2017}, pages={175–195} } @article{pei_liu_fan_migdalas_pardalos_2016, title={Future research on multiobjective coordinated scheduling problems for discrete manufacturing enterprises in supply chain environments}, journal={Supply chain management and logistics: innovative strategies and practical solutions}, author={Pei, J. and Liu, X. B. and Fan, W. J. and Migdalas, A. and Pardalos, P. M.}, year={2016}, pages={19–39} } @article{pei_liu_fan_pardalos_migdalas_goldengorin_yang_2016, title={Minimizing the makespan for a serial-batching scheduling problem with arbitrary machine breakdown and dynamic job arrival}, volume={86}, number={9-12}, journal={International Journal of Advanced Manufacturing Technology}, author={Pei, J. and Liu, X. B. and Fan, W. J. and Pardalos, P. M. and Migdalas, A. and Goldengorin, B. and Yang, S. L.}, year={2016}, pages={3315–3331} } @article{pei_liu_pardalos_fan_wang_yang_2016, title={Solving a supply chain scheduling problem with non-identical job sizes and release times by applying a novel effective heuristic algorithm}, volume={47}, number={4}, journal={International Journal of Systems Science}, author={Pei, J. and Liu, X. B. and Pardalos, P. M. and Fan, W. J. and Wang, L. and Yang, S. L.}, year={2016}, pages={765–776} } @article{pei_pardalos_liu_fan_yang_wang_2015, title={Coordination of production and transportation in supply chain scheduling}, volume={11}, number={2}, journal={Journal of Industrial and Management Optimization}, author={Pei, J. and Pardalos, P. M. and Liu, X. B. and Fan, W. J. and Yang, S. L. and Wang, L.}, year={2015}, pages={399–419} } @article{pei_fan_pardalos_liu_goldengorin_yang_2015, title={Preemptive scheduling in a two-stage supply chain to minimize the makespan}, volume={30}, number={4}, journal={Optimization Methods & Software}, author={Pei, J. and Fan, W. J. and Pardalos, P. M. and Liu, X. B. and Goldengorin, B. and Yang, S. L.}, year={2015}, pages={727–747} } @article{pei_pardalos_liu_fan_yang_2015, title={Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan}, volume={244}, number={1}, journal={European Journal of Operational Research}, author={Pei, J. and Pardalos, P. M. and Liu, X. B. and Fan, W. J. and Yang, S. L.}, year={2015}, pages={13–25} } @article{pei_liu_pardalos_fan_yang_2015, title={Single machine serial-batching scheduling with independent setup time and deteriorating job processing times}, volume={9}, number={1}, journal={Optimization Letters}, author={Pei, J. and Liu, X. B. and Pardalos, P. M. and Fan, W. J. and Yang, S. L.}, year={2015}, pages={91–104} } @article{fan_perros_2014, title={A novel trust management framework for multi-cloud environments based on trust service providers}, volume={70}, DOI={10.1016/j.knosys.2014.07.018}, journal={Knowledge-based Systems}, author={Fan, W. J. and Perros, H.}, year={2014}, pages={392–406} } @article{pei_liu_pardalos_fan_yang_wang_2014, title={Application of an effective modified gravitational search algorithm for the coordinated scheduling problem in a two-stage supply chain}, volume={70}, number={1-4}, journal={International Journal of Advanced Manufacturing Technology}, author={Pei, J. and Liu, X. B. and Pardalos, P. M. and Fan, W. J. and Yang, S. L. and Wang, L.}, year={2014}, pages={335–348} }