Center for Additive Manufacturing and Logistics - 1990 Uzsoy, R., Lee, C. Y., & Martin-Vega, L. A. (1990, April). Scheduling Semiconductor Test Operations: Minimizing Maximum Lateness and Number of Tardy Jobs on a Single Machine. Presented at the Workshop on Advanced Topics in Manufacturing, University of Florida, Gainesville, FL. Uzsoy, R., Lee, C. Y., & Martin-Vega, L. A. (1990, October). Scheduling Algorithms for Semiconductor Test Equipment. Presented at the ORSA/TIMS Joint National Meeting, Philadelphia, PA. Lee, C. Y., Uzsoy, R., & Martin-Vega, L. A. (1990, October). Scheduling Algorithms for Batch Processing Machines. Presented at the ORSA/TIMS Joint National Meeting, Philadelphia, PA. Uzsoy, R. (1990, February). Scheduling Semiconductor Testing Operations. Presented at the Graduate School of Industrial Administration, Carnegie-Mellon University. Uzsoy, R. (1990, April). Scheduling Semiconductor Testing Operations. Presented at the Purdue University. Uzsoy, R. (1990, November). Scheduling Algorithms for Batch Processing Machines. Presented at the University of Florida. Uzsoy, R., & Martin-Vega, L. A. (1990). Modelling Kanban-Based Demand-Pull Systems: A Survey and Critique. Manufacturing Review, 3, 1–6. Uzsoy, R., & Martin-Vega, L. A. (1990). Modelling Kanban-Based Demand-Pull Systems: A Survey and Critique. Proceedings, Manufacturing International '90. Presented at the Manufacturing International '90, Atlanta, GA. Sanii, E. T., Culbreth, C. T., & King, R. E. (1990). Integrated interchangeable end of arm tooling for furniture part manipulation. SME Transactions, 1, 127–153. Hopkins, D. C. (1990). Current Limiting Remote Power Control Module (Final Report No. NGT-01-002-009). NASA Marshal Space Flight Center. Luo, R. C., & Kay, M. G. (1990). A tutorial on multisensor integration and fusion. IECON Proceedings (Industrial Electronics Conference), 1, 707–722. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0-0025574877&partnerID=MN8TOARS