Center for Additive Manufacturing and Logistics - 1992 Uzsoy, R. (1992, November). Decomposition Algorithms for Scheduling Complex Dynamic Job Shops. Presented at the Arizona State University. Avramidis, A., O'Cinneide, C. A., Uzsoy, R., & Vitharana, P. (1992, November). Exact and Approximate Algorithms for Scheduling Batch Processing Machines. Presented at the ORSA/TIMS Joint National Meeting, San Francisco, CA. Church, L. K., Ovacik, I. M., & Uzsoy, R. (1992, November). A Shifting Bottleneck Methodology for Dynamic Job Shops. Presented at the ORSA/TIMS Joint National Meeting, San Francisco, CA. Church, L. K., & Uzsoy, R. (1992). Analysis of Periodic and Event-Driven Rescheduling Policies in Dynamic Shops. In G. A. Klutke, D. A. Mitta, B. O. Ninaji, & L. M. Seiford (Eds.), Proceedings of the First Industrial Engineering Research Conference (pp. 395–399). Uzsoy, R., & Ovacik, I. (1992, January). A Scheduling System Architecture for Semiconductor Testing Facilities. Presented at the Workshop on Machine Learning and Scheduling, College of Business Administration, University of Florida, Gainesville, Florida. Ovacik, I., & Uzsoy, R. (1992, April). A Scheduling System Architecture for Semiconductor Testing Operations. Presented at the TIMS/ORSA Joint National Meeting, Orlando, FL. Chandru, V., Lee, C. Y., & Uzsoy, R. (1992, April). Minimizing Total Completion Time on Batch Processing Machines. Presented at the TIMS/ORSA Joint National Meeting, Orlando, FL. Morris, S. E., Ovacik, I., & Uzsoy, R. (1992, April). A Simulated Annealing Approach to Single-Machine Scheduling with Sequence-Dependent Setup Times. Presented at the TIMS/ORSA Joint National Meeting, Orlando, FL. Uzsoy, R. (1992, April). A Scheduling System Architecture for Semiconductor Testing Facilities. Presented at the University of Michigan. Church, L. K., & Uzsoy, R. (1992, April). Analysis of Periodic and Event-Driven Rescheduling Policies in Dynamic Shops. Presented at the TIMS/ORSA Joint National Meeting, Orlando, FL. Uzsoy, R. (1992, August). A Scheduling System Architecture for Semiconductor Testing Facilities. Presented at the SRC/DARPA CIM/IC Workshop, Stanford University. Lee, C. Y., Martin-Vega, L. A., & Uzsoy, R. (1992, June). Decision Support System for Dynamic Job Shop Scheduling. Presented at the EURO/TIMS Joint International Conference, Helsinki, Finland. Uzsoy, R. (1992, August). Production Planning and Scheduling in the Semiconductor Industry. Presented at the Intel Corporation, Chandler, AZ. Traub, R., Chand, S., & Uzsoy, R. (1992, November). Rolling Horizon Algorithms for Scheduling Problems with Dynamic Arrivals. Presented at the ORSA/TIMS Joint National Meeting, San Francisco, CA. Uzsoy, R., Church, L. K., Ovacik, I. M., & Hinchman, J. (1992). Dispatching Rules For Semiconductor Testing Operations: A Computational Study. Thirteenth IEEE/CHMT International Electronics Manufacturing Technology Symposium, 272–276. https://doi.org/10.1109/iemt.1992.639903 Lee, C.-Y., & Uzsoy, R. (1992). A new dynamic programming algorithm for the parallel machines total weighted completion time problem. Operations Research Letters, 11(2), 73–75. https://doi.org/10.1016/0167-6377(92)90035-2 Ulusoy, G., & Uzsoy, R. (1992). Computer-Aided Process Planning and Material Requirements Planning: First Steps towards Computer-Integrated Manufacturing. Interfaces, 22(2), 76–86. https://doi.org/10.1287/inte.22.2.76 Uzsoy, R., Lee, C.-Y., Martin-Vega, L. A., & Hinchman, J. (1992). Scheduling Semiconductor Test Operations: Optimization and Approximation. https://doi.org/10.1007/978-3-642-77537-6_11 Church, L. K., & Uzsoy, R. (1992). Analysis of periodic and event-driven rescheduling policies in dynamic shops. International Journal of Computer Integrated Manufacturing, 5(3), 153–163. https://doi.org/10.1080/09511929208944524 Uzsoy, R., Lee, C. Y., & Martin Vega, L. A. (1992). A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING. IIE Transactions, 24(4), 47–60. https://doi.org/10.1080/07408179208964233 Ovacik, I. M., & Uzsoy, R. (1992). A shifting bottleneck algorithm for scheduling semiconductor testing operations. Journal of Electronics Manufacturing, 02(03), 119–134. https://doi.org/10.1142/s0960313192000157 Lee, C.-Y., Uzsoy, R., & Martin-Vega, L. A. (1992). Efficient Algorithms for Scheduling Semiconductor Burn-In Operations. Operations Research, 40(4), 764–775. https://doi.org/10.1287/opre.40.4.764 Uzsoy, R., Lee, C.-Y., & Martin-Vega, L. A. (1992). Scheduling semiconductor test operations: Minimizing maximum lateness and number of tardy jobs on a single machine. Naval Research Logistics, 39(3), 369–388. https://doi.org/10.1002/1520-6750(199204)39:3<369::aid-nav3220390307>3.0.co;2-f Hopkins, D. C. (1992). Power Measurement in Converters [Final Report]. NASA Lewis Research Center. Hopkins, D. C. (1992). Materials Support for the Investigation of Charge Equalization in Serial Batteries (Final Report for NASA Contract No. NAG8-123; pp. VII–1 – VII-21). Hopkins, D. C., Bhavnani, S. H., & Dalal, K. H. (1992). Numerical Modeling and Experimental Comparison of Copper Bonded AlN, Al2O3 and BeO Power Hybrid Structures. Proceedings of the 1992 International Electronics Packaging Conference. Presented at the 1992 International Electronics Packaging Conference, Austin, TX. Hopkins, D. C., Bhavnani, S. H., & Dalal, K. H. (1992). Thermal Performance Comparison and Metallurgy of Direct Copper Bonded AlN, Al2O3 and BeO Assemblies. Proceedings of the 1992 ISHM International Symposium on Microelectronics, 577–583. Kay, M. G., & Luo, R. C. (1992). Selection of sensor-based free-ranging AGV systems. IEEE International Conference on Emerging Technologies and Factory Automation, ETFA, 1992-August, 184–189. https://doi.org/10.1109/ETFA.1992.683250 Kay, M. G., & Luo, R. C. (1992). Camera Placement for Global Vision. IEEE International Conference on Intelligent Robots and Systems, 2, 917–924. https://doi.org/10.1109/IROS.1992.594502 Hunter, N. A., King, R. E., & Nuttle, H. L. W. (1992). An Apparel-supply System for QR Retailing. Journal of the Textile Institute, 83(3), 462–471. https://doi.org/10.1080/00405009208631220 Deleersnyder, J. L., Hodgson, T. J., King, R. E., O'grady, P. J., & Savva, A. (1992). Integrating kanban type pull systems and MRP type push systems: Insights from a Markovian model. IIE Transactions, 24(3), 43–56. https://doi.org/10.1080/07408179208964223