Center for Additive Manufacturing and Logistics - 1993 Rock, C., Pete, T., & Okazaki, K. (1993). Detailed Analysis of Phase Formation During Mechanical Alloying of Nb and Al. Proceedings of 1993 World Powder Metallurgy Congress, Japan Society of Powder and Powder Metallurgy, 1, 100. Rock, C., & Okazaki, K. (1993). Mechanical Grinding of 6 mol% Y2O3-ZrO2. Proceedings of 1993 World Powder Metallurgy Congress, Japan Society of Powder and Powder Metallurgy, 1, 147. Uzsoy, R. (1993, February). A Shifting Bottleneck Algorithm for Scheduling Complex Dynamic Job Shops. Presented at the Carnegie-Mellon University. Uzsoy, R. (1993, March). Scheduling Batch Processing Machines with Nonidentical Job Sizes. Presented at the McGill University, Montreal, Canada. Chand, S., Traub, R., & Uzsoy, R. (1993, May). Rolling Horizon Algorithms for the Dynamic Total Completion Time Problem. Presented at the TIMS/ORSA Joint National Meeting, Chicago, IL. Uzsoy, R. (1993, August). A Decomposition Approach for Scheduling Semiconductor Testing Operations. Presented at the Eighth SRC/ARPA CIM-IC Workshop, Carnegie-Mellon University. Gary, K., Uzsoy, R., Kempf, K., & Smith, S. (1993, June). Assessing the Quality of Production Schedules. Presented at the Montreal Manufacturing Workshop, Montreal, Canada. Ovacik, I. M., & Uzsoy, R. (1993, September). A Decomposition Approach for Scheduling Complex Dynamic Job Shops. Presented at the Computer and Systems Research Laboratory, University of Illinois at Urbana-Champaign. Ovacik, I. M., & Uzsoy, R. (1993, November). Rolling Horizon Algorithms for a Single-Machine Dynamic Scheduling Problem with Sequence-Dependent Setup Times. Presented at the ORSA/TIMS Joint National Meeting, Phoenix, AZ. Ovacik, I. M., & Uzsoy, R. (1993, December). A Decomposition Approach for Scheduling Complex Dynamic Job Shops. Presented at the College of Business Administration, University of Toledo. Kempf, K. G., Ovacik, I. M., & Uzsoy, R. (1993, November). Aggregation and Segmentation in Evaluation and Comparison of Production Schedules. Presented at the ORSA/TIMS Joint National Meeting, Phoenix, AZ. Kempf, K. G., & Uzsoy, R. (1993, November). Decomposition Methods for Scheduling Complex Job Shops. Presented at the ORSA/TIMS Joint National Meeting, Phoenix, AZ. Uzsoy, R. (1993). Decomposition Methods for Scheduling Complex Dynamic Job Shops. Proceedings of the NSF Grantees Conference, 1253–1257. Ovacik, I. M., & Uzsoy, R. (1993). Exploiting Real-Time Shop Floor Status Information to Schedule Complex Job Shops. Proceedings of the Second Industrial Engineering Research Conference, 868–872. Perry, C. N., & Uzsoy, R. (1993). Reactive scheduling of a semiconductor testing facility. Proceedings of 15th IEEE/CHMT International Electronic Manufacturing Technology Symposium. Presented at the 15th IEEE/CHMT International Electronic Manufacturing Technology Symposium. https://doi.org/10.1109/iemt.1993.398156 Ovacik, I. M., & Uzsoy, R. (1993). Worst-case error bounds for parallel machine scheduling problems with bounded sequence-dependent setup times. Operations Research Letters, 14(5), 251–256. https://doi.org/10.1016/0167-6377(93)90089-y Lee, C. Y., Martin Vega, L. A., Uzsoy, R., & Hinchman, J. (1993). Implementation of a decision support system for scheduling semiconductor test operations. Journal of Electronics Manufacturing, 03(03), 121–131. https://doi.org/10.1142/s0960313193000140 Chandru, V., Lee, C. Y., & Uzsoy, R. (1993). Minimizing total completion time on batch processing machines. International Journal of Production Research, 31(9), 2097–2121. https://doi.org/10.1080/00207549308956847 Chandru, V., Lee, C.-Y., & Uzsoy, R. (1993). Minimizing total completion time on a batch processing machine with job families. Operations Research Letters, 13(2), 61–65. https://doi.org/10.1016/0167-6377(93)90030-k Uzsoy, R., Church, L. K., Ovacik, I. M., & Hinchman, J. (1993). Performance evaluation of dispatching rules for semiconductor testing operations. Journal of Electronics Manufacturing, 03(02), 95–105. https://doi.org/10.1142/s0960313193000115 Hopkins, D. C., Bhavnani, S. H., & Dalal, K. H. (1993). Effect of Metallization Thickness on Thermal Conductance of a First-Level Power Hybrid Structure. International Journal of Microcircuits and Electronic Packaging, (2nd Quarter), 189–193. Hopkins, D. C. (1993). High Density Shunt Regulator Development [Final report]. Martin Marietta Corporation. Hopkins, D. C. (1993). Investigation of High Frequency Resonant Effects in Batteries [Final report]. NASA Lewis Research Center. Hopkins, D. C. (1993). Systems Engineering of Shared Resources: Decision Support System for the Concept Definition Phases. In NASA-OAI Collaborative Aerospace Research and Fellowship Program at Lewis Research Center (pp. 25–26) [Final report]. Lewis Research Center. NASA Lewis Research Center. (1993). Systems Engineering of Shared Resources: Decision Support for the Concept Design Phase – Modeling Development [Interim Report]. Hopkins, D. C., & Bhavnani, S. H. (1993). Determining Conductor Thickness in Power Circuits that Operate at Long Wavelength Frequencies. Proceedings of the 1993 ISHM Intternational Symposium on Microelectronics, 656–661. Hopkins, D. C., Mosling, C. R., & Hung, S. T. (1993). Dynamic equalization during charging of serial energy storage elements. IEEE Transactions on Industry Applications, 29(2), 363–368. https://doi.org/10.1109/28.216545 Hung, S. T., Hopkins, D. C., & Mosling, C. R. (1993). Extension of battery life via charge equalization control. IEEE Transactions on Industrial Electronics, 40(1), 96–104. https://doi.org/10.1109/41.184826 Kay, M. G., & Luo, R. C. (1993). Global vision for the control of free-ranging AGV systems. Proceedings - IEEE International Conference on Robotics and Automation, 2, 14–19. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0-0027229864&partnerID=MN8TOARS Janet, J. A., Luo, R. C., Aras, C. M., & Kay, M. G. (1993). Sonar windows and geometrically represented objects for mobile robot self-referencing. 1324–1331. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0-0027834340&partnerID=MN8TOARS King, R. E., Hodgson, T. J., & Chafee, F. W. (1993). ROBOT TASK SCHEDULING IN A FLEXIBLE MANUFACTURING CELL. IIE Transactions, 25(2), 80–87. https://doi.org/10.1080/07408179308964280 Hunter, N. A., King, R. E., Nuttle, H. L. W., & Wilson, J. R. (1993). North Carolina Apparel Pipeline Modelling Project. International Journal of Clothing Science and Technology, 5(3/4), 19–24. https://doi.org/10.1108/eb003016