Center for Additive Manufacturing and Logistics - 1996 Rock, C., & Okazaki, K. (1996). Phase Identification, Thermal Stability and Electro-Discharge Consolidation in a Mechanically Alloyed Nb-Al. In C. Suryanarayana, J. Singh, & F. H. Froes (Eds.), Processing and properties of nanocrystalline materials (p. 199). Warrendale, Pennsylvania: TMS. Qiu, J., Rock, C., Shibata, T., & Okazaki, K. (1996). Mechanical Alloying of Al91Ni5Cu2Ti1.4Zr0.4Mm0.2 Powders and Electro-Discharge Consolidation into Bulk. Materials Science Forum, 235-238, 273–278. https://doi.org/10.4028/www.scientific.net/MSF.235-238.273 Uzsoy, R., & Venkatachalam, G. (1996, October). Production Planning with Product Recovery and Remanufacturing. Presented at the INFORMS National Meeting, Atlanta, GA. Uzsoy, R., & Wang, C. S. (1996, October). Scheduling Semiconductor Burn-In Operations in the Presence of Resource Constraints. Presented at the INFORMS National Meeting, Atlanta, GA. Uzsoy, R. (1996, January). Shop Floor Control for Semiconductor Manufacturing Facilities. Presented at the Intel Corporation, Rio Rancho, NM. Uzsoy, R. (1996, March). Shop Floor Control for Semiconductor Manufacturing Facilities. Presented at the Hitachi Semiconductor U.S., Irving, TX. Uzsoy, R. (1996, April). Shop Floor Control for Semiconductor Manufacturing Facilities. Presented at the Department of Industrial and Management Systems Engineering, Arizona State University, Tempe, AZ. Uzsoy, R. (1996, July). Global Scheduling Procedures for Semiconductor Manufacturing Facilities. Presented at the Advanced Micro Devices, Austin, TX. Uzsoy, R. (1996, October). Shop Floor Control for Semiconductor Manufacturing Facilities. Presented at the Delco Electronics, Kokomo, IN. Uzsoy, R. (1996, October). Decomposition Methods for Scheduling Complex Job Shops. Presented at the College of Business Administration, University of Texas at Austin, Austin, TX. Uzsoy, R., Clegg, A., Williams, D. J., Venkatadri, U., & Venkatachalam, G. (1996, May). Supply Chain Coordination in the Presence of Remanufacturing. Presented at the INFORMS National Meeting, Washington DC. Uzsoy, R., & Venkatadri, U. (1996, May). Determining Disassembly Configurations in Remanufacturing. Presented at the INFORMS National Meeting, Washington DC. Lee, C. Y., & Uzsoy, R. (1996, May). Minimizing Makespan for Scheduling Semiconductor Burn-In Operations with Different Arrival Times. Presented at the INFORMS National Meeting, Washington DC. Uzsoy, R., Rajagopalan, S., & Ovacik, I. M. (1996, May). Integrating Optimum Estimation with Simulated Annealing for a Single Machine Scheduling Problem. Presented at the INFORMS National Meeting, Washington DC. Chen, S., Takoudis, C., & Uzsoy, R. (1996). Yield of silicon selective epitaxial growth and its role in the production planning and control of three-dimensional semiconductor devices. Nineteenth IEEE/CPMT International Electronics Manufacturing Technology Symposium. Presented at the Nineteenth IEEE/CPMT International Electronics Manufacturing Technology Symposium. https://doi.org/10.1109/iemt.1996.559732 Nemoto, K., Akcali, E., & Uzsoy, R. (1996). Quantifying the benefits of cycle time reduction in semiconductor wafer fabrication. Nineteenth IEEE/CPMT International Electronics Manufacturing Technology Symposium, 130–136. https://doi.org/10.1109/iemt.1996.559705 Kayton, D., Teyner, T., Schwartz, C., & Uzsoy, R. (1996). Effects of dispatching and down time on the performance of wafer fabs operating under theory of constraints. Nineteenth IEEE/CPMT International Electronics Manufacturing Technology Symposium. Presented at the Nineteenth IEEE/CPMT International Electronics Manufacturing Technology Symposium. https://doi.org/10.1109/iemt.1996.559681 Ovacik, I. M., & Uzsoy, R. (1996). Decomposition methods for scheduling semiconductor testing facilities. International Journal of Flexible Manufacturing Systems, 8(4). https://doi.org/10.1007/bf00170018 Chand, S., Traub, R., & Uzsoy, R. (1996). Single-machine scheduling with dynamic arrivals: Decomposition results and an improved algorithm. Naval Research Logistics, 43(5), 709–719. https://doi.org/10.1002/(sici)1520-6750(199608)43:5<709::aid-nav7>3.0.co;2-9 Chand, S., Traub, R., & Uzsoy, R. (1996). An iterative heuristic for the single machine dynamic total completion time scheduling problem. Computers & Operations Research, 23(7), 641–651. https://doi.org/10.1016/0305-0548(95)00071-2 Holtsclaw, H. H., & Uzsoy, R. (1996). Machine Criticality Measures and Subproblem Solution Procedures in Shifting Bottleneck Methods: A Computational Study. The Journal of the Operational Research Society, 47(5), 666. https://doi.org/10.2307/3010017 Houck, C. R., Culbreth, C. T., & King, R. E. (1996). Neural network scheduling of a flexible manufacturing cell using dynamic process plans. International Journal of Flexible Automation and Integrated Manufacturing, 4(3-4), 213–229. Hopkins, D. C. (1996). Investigation of a Power Package Incorporating a Direct Attached Ceramic/AlSiC Structure [Final report]. BrushWellman Incorporated. Hopkins, D. C. (1996). High Temperature Capacitors [Final report]. Custom Electronics Inc. Hopkins, D. C., Pitarressi, J. M., Fridline, D. R., & Karker, J. A. (1996). System Design Considerations for using a Direct–Attached–Ceramic MMC Power Package. Proceedings of 32nd International Power Conversion Conference, 683–690. Goodridge, S. G., Kay, M. G., & Luo, R. C. (1996). Multilayered fuzzy behavior fusion for real-time reactive control of systems with multiple sensors. IEEE Transactions on Industrial Electronics, 43(3), 387–394. https://doi.org/10.1109/41.499811 Goodridge, S. G., & Kay, M. G. (1996). Multimedia sensor fusion for intelligent camera control. IEEE International Conference on Multisensor Fusion and Integration for Intelligent Systems, 655–662. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0-0030411519&partnerID=MN8TOARS Joines, J. A., Culbreth, C. T., & King, R. E. (1996). Manufacturing cell design: an integer programming model employing genetic algorithms. IIE Transactions, 28(1), 69–85. https://doi.org/10.1080/07408179608966253 Stanfield, P. M., King, R. E., & Joines, J. A. (1996). Scheduling arrivals to a production system in a fuzzy environment. European Journal of Operational Research, 93(1), 75–87. https://doi.org/10.1016/0377-2217(95)00117-4 King, R. E., & Hunter, N. A. (1996). Demand Re-estimation and Inventory Replenishment of Basic Apparel in a Specialty Retail Chain. Journal of the Textile Institute, 87(1), 31–41. https://doi.org/10.1080/00405009608659100 Hunter, N. A., King, R. E., & Nuttle, H. L. W. (1996). Evaluation of Traditional and Quick-response Retailing Procedures by Using a Stochastic Simulation Model. Journal of the Textile Institute, 87(1), 42–55. https://doi.org/10.1080/00405009608659101 Houck, C. R., Joines, J. A., & Kay, M. G. (1996). Comparison of genetic algorithms, random restart, and two-opt switching for solving large location-allocation problems. Computers & Operations Research, 23(6), 587–596. https://doi.org/10.1016/0305-0548(95)00063-1