Center for Additive Manufacturing and Logistics - 1999 Hopkins, D. C. (1999). Power Electronics Packaging. 14th Annual IEEE Conference on Applied Power Electronics Conference and Exposition (APEC). Presented at the 14th Annual IEEE Conference on Applied Power Electronics Conference and Exposition (APEC), Dallas, TX. Uzsoy, R. (1999). Production Engineering. In McGraw-Hill Encyclopedia of Science and Technology. McGraw-Hill. Horiguchi, K., Uzsoy, R., & Venkateswaran, S. (1999). A Fast Approximation Algorithm for Cycle Time Estimation in Wafer Fabrication Facilities. Proceedings of the 8th Industrial Engineering Research Conference. Presented at the 8th Industrial Engineering Research Conference, Phoenix, AZ. Uzsoy, R. (1999, March). Current and Future Trends and Scheduling Semiconductor Manufacturing Systems. Presented at the Applied Materials Scheduling Summit, Applied Materials, San Jose, CA. Aytug, H., & Uzsoy, R. (1999, November). A Scheduling Architecture for Semiconductor Manufacturing. Presented at the Intel Corporation, Chandler, AZ. Meacham, A., Uzsoy, R., & Venkatadri, U. (1999). Optimal disassembly configurations for single and multiple products. Journal of Manufacturing Systems, 18(5), 311–322. https://doi.org/10.1016/s0278-6125(00)87634-7 O'Donovan, R., Uzsoy, R., & McKay, K. N. (1999). Predictable scheduling of a single machine with breakdowns and sensitive jobs. International Journal of Production Research, 37(18), 4217–4233. https://doi.org/10.1080/002075499189745 Woo, M., Uzsoy, R., & Ghafoor, A. (1999). Media Streams Scheduling for Synchronization in Distributed Multimedia Systems. Journal of Parallel and Distributed Computing, 56(3), 272–295. https://doi.org/10.1006/jpdc.1998.1526 Mehta, S. V., & Uzsoy, R. (1999). Predictable scheduling of a single machine subject to breakdowns. International Journal of Computer Integrated Manufacturing, 12(1), 15–38. https://doi.org/10.1080/095119299130443 Lee, C.-Y., & Uzsoy, R. (1999). Minimizing makespan on a single batch processing machine with dynamic job arrivals. International Journal of Production Research, 37(1), 219–236. https://doi.org/10.1080/002075499192020 Uzsoy, R. (1999). A review of: “The Planning and Scheduling of Production Systems” Edited by A. Arbita and S.E. Elmaghraby Chapman and Hall, 1997, 367 pages, ISBN 0-412-61020-5 [Review of Planning and Scheduling of Production Systems, by A. Artiba & S. E. Elmaghraby]. IIE Transactions, 31(2), 190–193. https://doi.org/10.1080/07408179908969819 Hodgson, T. J., Kay, M. G., Mittal, R. O., & Tang, S.-Y. I. (1999). Evaluation of cylindricity using combinatorics. IIE Transactions (Institute of Industrial Engineers), 31(1), 39–47. https://doi.org/10.1023/A:1007572617551 King, R., & Moon, K. (1999). Quick response replenishment: A case study. 1999 Winter Simulation Conference: proceedings: Pointe Hilton Squaw Peak Resort, Phoenix, AZ, U.S.A., 5-8 December 1999, 2, 1341–1349. https://doi.org/10.1109/wsc.1999.816863 Weintraub, A., Cormier, D., Hodgson, T., King, R., Wilson, J., & Zozom, A. (1999). Scheduling with alternatives: a link between process planning and scheduling. IIE Transactions, 31(11), 1093–1102. https://doi.org/10.1080/07408179908969910 Hodgson, T., King, R., Thoney, K., Stanislaw, N., Weintraub, A. J., & Zozom, A. (1999). On satisfying due-dates in large job shops: Idle time insertion. IIE Transactions, 32(2), 177–180. https://doi.org/10.1080/07408170008963890 Hodgson, T., Kay, M., Mittal, R. O., & Tang, S. Y. (1999). Evaluation of cylindricity using combinatorics. IIE Transactions, 31(1), 39–47. https://doi.org/10.1080/07408179908969804