Center for Additive Manufacturing and Logistics

Works Published in 1999

search works

Displaying all 16 works

Sorted by most recent date added to the index first, which may not be the same as publication date order.

1999 conference paper

Power Electronics Packaging

14th Annual IEEE Conference on Applied Power Electronics Conference and Exposition (APEC). Presented at the 14th Annual IEEE Conference on Applied Power Electronics Conference and Exposition (APEC), Dallas, TX.

By: D. Hopkins

Event: 14th Annual IEEE Conference on Applied Power Electronics Conference and Exposition (APEC) at Dallas, TX on March 14-18, 1999

Source: NC State University Libraries
Added: July 22, 2023

1999 chapter

Production Engineering

In McGraw-Hill Encyclopedia of Science and Technology. McGraw-Hill.

By: R. Uzsoy

Source: NC State University Libraries
Added: May 1, 2022

1999 conference paper

A Fast Approximation Algorithm for Cycle Time Estimation in Wafer Fabrication Facilities

Proceedings of the 8th Industrial Engineering Research Conference. Presented at the 8th Industrial Engineering Research Conference, Phoenix, AZ.

By: K. Horiguchi, R. Uzsoy & S. Venkateswaran

Event: 8th Industrial Engineering Research Conference at Phoenix, AZ

Source: NC State University Libraries
Added: May 1, 2022

1999 speech

Current and Future Trends and Scheduling Semiconductor Manufacturing Systems

Uzsoy, R. (1999, March). Presented at the Applied Materials Scheduling Summit, Applied Materials, San Jose, CA.

By: R. Uzsoy

Event: Applied Materials Scheduling Summit, Applied Materials at San Jose, CA

Source: NC State University Libraries
Added: May 1, 2022

1999 speech

A Scheduling Architecture for Semiconductor Manufacturing

Aytug, H., & Uzsoy, R. (1999, November). Presented at the Intel Corporation, Chandler, AZ.

By: H. Aytug & R. Uzsoy

Event: Intel Corporation at Chandler, AZ

Source: NC State University Libraries
Added: May 1, 2022

1999 journal article

Optimal disassembly configurations for single and multiple products

Journal of Manufacturing Systems, 18(5), 311–322.

By: A. Meacham*, R. Uzsoy* & U. Venkatadri*

author keywords: disassembly planning; column generation; environmentally conscious manufacturing
Sources: Crossref, ORCID
Added: March 6, 2022

1999 journal article

Predictable scheduling of a single machine with breakdowns and sensitive jobs

International Journal of Production Research, 37(18), 4217–4233.

By: R. O'Donovan, R. Uzsoy* & K. McKay

Sources: Crossref, ORCID
Added: March 5, 2022

1999 journal article

Media Streams Scheduling for Synchronization in Distributed Multimedia Systems

Journal of Parallel and Distributed Computing, 56(3), 272–295.

By: M. Woo*, R. Uzsoy* & A. Ghafoor*

author keywords: distributed multimedia systems; multimedia documents; synchronization; heterogeneous channel systems; transmission scheduling; heuristic algorithms
TL;DR: This paper proposes two heuristic algorithms with time complexity ofO(nlogn+nm), wherenis the number of data units to be scheduled andmthe number of channels available, and develops an enumerative algorithm to obtain the exact solutions. (via Semantic Scholar)
Sources: Crossref, ORCID
Added: March 5, 2022

1999 journal article

Predictable scheduling of a single machine subject to breakdowns

International Journal of Computer Integrated Manufacturing, 12(1), 15–38.

By: S. Mehta & R. Uzsoy

TL;DR: A predictable scheduling approach is presented, where the predictive schedule is built with such objectives and the effects of disruptions on planned activities are measured by the difference between planned and realized job completion times. (via Semantic Scholar)
Sources: Crossref, ORCID
Added: March 5, 2022

1999 journal article

Minimizing makespan on a single batch processing machine with dynamic job arrivals

International Journal of Production Research, 37(1), 219–236.

By: C. Lee & R. Uzsoy

TL;DR: This work considers the problem of minimizing makespan Cmax on a single batch processing machine in the presence of dynamic job arrivals and presents polynomial and pseudopolynomial-time algorithms for several special cases, develop efficient heuristics for the general problem and evaluate their performance through extensive computational experiments. (via Semantic Scholar)
UN Sustainable Development Goal Categories
8. Decent Work and Economic Growth (OpenAlex)
Sources: Crossref, ORCID
Added: March 5, 2022

1999 book review

A review of: “The Planning and Scheduling of Production Systems” Edited by A. Arbita and S.E. Elmaghraby Chapman and Hall, 1997, 367 pages, ISBN 0-412-61020-5

[Review of Planning and Scheduling of Production Systems, by A. Artiba & S. E. Elmaghraby]. IIE Transactions, 31(2), 190–193.

By: R. Uzsoy*

Sources: NC State University Libraries, ORCID
Added: February 26, 2022

1999 journal article

Evaluation of cylindricity using combinatorics

IIE Transactions (Institute of Industrial Engineers), 31(1), 39–47.

By: T. Hodgson n, M. Kay n, R. Mittal* & S. Tang*

Contributors: T. Hodgson n, M. Kay n, R. Mittal* & S. Tang*

TL;DR: This method is self-contained, without the requirement of mathematical programming software support, and is equal to or superior to other methods of evaluating cylindricity in terms of accuracy, efficiency, and simplicity. (via Semantic Scholar)
Source: ORCID
Added: April 29, 2020

1999 conference paper

Quick response replenishment: A case study

1999 Winter Simulation Conference: proceedings: Pointe Hilton Squaw Peak Resort, Phoenix, AZ, U.S.A., 5-8 December 1999, 2, 1341–1349.

By: R. King n & K. Moon n

TL;DR: A case study based upon an ongoing analysis for a U.S. fiber/fabric manufacturer who is expanding its operations vertically to include cut and sew operations in Mexico. (via Semantic Scholar)
Sources: NC State University Libraries, ORCID
Added: August 6, 2018

1999 journal article

Scheduling with alternatives: a link between process planning and scheduling

IIE Transactions, 31(11), 1093–1102.

By: A. Weintraub, D. Cormier*, T. Hodgson*, R. King*, J. Wilson* & A. Zozom

TL;DR: An extensive experimental performance evaluation indicates that in a broad range of industrial settings, the second scheduling algorithm can rapidly identify optimal or nearly optimal schedules. (via Semantic Scholar)
Sources: NC State University Libraries, ORCID
Added: August 6, 2018

1999 journal article

On satisfying due-dates in large job shops: Idle time insertion

IIE Transactions, 32(2), 177–180.

By: T. Hodgson n, R. King n, K. Thoney n, N. Stanislaw n, A. Weintraub n & A. Zozom n

TL;DR: This work considers the problem of minimizing maximum lateness in a job shop and a conceptually simple simulation based procedure described in a recent paper by Hodgson et al. is modified to provide improved schedules. (via Semantic Scholar)
UN Sustainable Development Goal Categories
8. Decent Work and Economic Growth (OpenAlex)
Sources: NC State University Libraries, ORCID
Added: August 6, 2018

1999 journal article

Evaluation of cylindricity using combinatorics

IIE Transactions, 31(1), 39–47.

By: T. Hodgson*, M. Kay*, R. Mittal* & S. Tang*

Contributors: T. Hodgson*, M. Kay*, R. Mittal* & S. Tang*

Sources: NC State University Libraries, ORCID
Added: August 6, 2018

Citation Index includes data from a number of different sources. If you have questions about the sources of data in the Citation Index or need a set of data which is free to re-distribute, please contact us.

Certain data included herein are derived from the Web of Science© and InCites© (2024) of Clarivate Analytics. All rights reserved. You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.