Edward P. Fitts Department of Industrial & Systems Engineering - 1994 Chand, S., Traub, R., & Uzsoy, R. (1994, May). Single Machine Scheduling with Dynamic Arrivals: Decomposition Results and a Forward Algorithm. Presented at the Annual CORS Scheduling Workshop, Montreal, Canada. Lee, C. Y., Martin-Vega, L. A., Uzsoy, R., & Hinchman, J. (1994, May). Implementation of a Decision Support System for Scheduling Semiconductor Testing Operations. Presented at the CORS Annual Conference, Montreal, Canada. Uzsoy, R. (1994). Scheduling Complex Dynamic Job Shops with Application to Semiconductor Manufacturing. Proceedings of the NSF Grantees Conference, 383–384. Hase, R., Takoudis, C. G., & Uzsoy, R. (1994). Cellular and Reentrant Layouts for Wafer Fabrication. Proceedings of the Electrochemical Society Meeting. Presented at the Electrochemical Society Meeting, San Francisco, CA. Hase, R. C., Burgos, M. C., Chen, S., Uzsoy, R., & Takoudis, C. G. (1994). Relationships Between Process Fundamentals, Facility Design and Production Control of Semiconductor Manufacturing Systems. Proceedings of the 1994 Annual Meeting, American Institute of Chemical Engineers. Presented at the 1994 Annual Meeting, American Institute of Chemical Engineers, San Francisco, CA. Uzsoy, R. (1994, March). Production Scheduling and Facility Design in Semiconductor Manufacturing. Presented at the Department of Manufacturing Engineering, Loughborough University of Technology, Loughborough, UK. Uzsoy, R., & Takoudis, C. G. (1994, October). Production Scheduling and Facility Design in Semiconductor Manufacturing. Presented at the SEMATECH Operational Modeling Workshop, Austin, TX. Ovacik, I. M., & Uzsoy, R. (1994, October). Decomposition Algorithms for Scheduling Large Complex Job Shops. Presented at the Mid-West Round Table on Manufacturing and Logistics, Northwestern University, Evanston, IL. Mehta, S. V., & Uzsoy, R. (1994, April). A Heuristic for Generating Robust Predictive Schedules. Presented at the TIMS/ORSA Joint National Meeting, Boston, MA. Cetinkaya, F. C., & Uzsoy, R. (1994, April). Lot Streaming in a Two-Stage Hybrid Flow Shop. Presented at the TIMS/ORSA Joint National Meeting, Boston, MA. Chand, S., Uzsoy, R., & Traub, R. (1994, April). Single Machine Dynamic Scheduling: Decomposition Results and Rolling Horizon Procedures. Presented at the TIMS/ORSA Joint National Meeting, Boston, MA. Ovacik, I. M., & Uzsoy, R. (1994, April). Decomposition Algorithms for Scheduling Large Complex Job Shops. Presented at the TIMS/ORSA Joint National Meeting, Boston, MA. Ovacik, I. M., & Uzsoy, R. (1994, April). Scheduling Algorithms for Parallel Machines with Sequence-Dependent Setup Times. Presented at the TIMS/ORSA Joint National Meeting, Boston, MA. Toktay, L. B., & Uzsoy, R. (1994, April). A Capacity Allocation Problem with Integer Side Constraints. Presented at the TIMS/ORSA Joint National Meeting, Boston, MA. Hase, R., Takoudis, C. G., & Uzsoy, R. (1994). Cellular and reentrant layouts for semiconductor wafer fabrication facilities. Proceedings of 16th IEEE/CPMT International Electronic Manufacturing Technology Symposium, 112–118, https://doi.org/10.1109/iemt.1994.404681 Ovacikt, I. M., & Uzsoy, R. (1994). Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times. International Journal of Production Research, 32(6), 1243–1263. https://doi.org/10.1080/00207549408956998 Ulusoy, G., & Uzsoy, R. (1994). A robust strategy approach to a strategic mobility problem. European Journal of Operational Research, 79(2), 266–276. https://doi.org/10.1016/0377-2217(94)90357-3 Ovacik, I. M., & Uzsoy, R. (1994). Exploiting shop floor status information to schedule complex job shops. Journal of Manufacturing Systems, 13(2), 73–84. https://doi.org/10.1016/0278-6125(94)90023-x Lee, C. Y., Lin, C. S., Uzsoy, R., & Wong, C. C. (1994). Implementation of a demand-pull system in a job shop environment. International Journal of Production Research, 32(12), 2915–2927. https://doi.org/10.1080/00207549408957108 Uzsoy, R., Lee, C. Y., & Martin Vega, L. A. (1994). A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART II: SHOP-FLOOR CONTROL. IIE Transactions, 26(5), 44–55. https://doi.org/10.1080/07408179408966627 Uzsoy, R. (1994). Scheduling a single batch processing machine with non-identical job sizes. International Journal of Production Research, 32(7), 1615–1635. https://doi.org/10.1080/00207549408957026 Culbreth, C. T., Hopkins, J. M., & King, R. E. (1994). An object-oriented control architecture for flexible manufacturing cells: A case study. International Journal of Flexible Automation and Integrated Manufacturing, 2(1-2), 95–117. King, R., Hunter, A., Nuttle, H., Wilson, J., & Fang, S. (1994). Modeling the Actions and Interactions of the Textile-Apparel-Retail Pipeline. In L. Burke & J. Jackman (Eds.), 3rd Industrial Engineering Research Conference Proceedings (pp. 142–147). Huang, T. M., Lin, C. H., Lin, W. W., & Fang, S. (1994). A Relaxed Interior Path Following Primal – Dual Algorithm for Convex Quadratic Programming. Mathematics Today, (Special Issue XII-A), 115–144. Fang, S., & Wu, S. Y. (1994). Entropic Path-Following for Linear Semi-Infinite Programming. Mathematics Today, (Special Issue XII-A), 1–16. Fang, S., & Natu, M. (1994). The Complexity of Finding K Disjoint Paths in a Network. Journal of the Chinese Institute of Industrial Engineers, 11, 125–128. Nuttle, H. L. W., Wu, P. T., King, R., Wilson, J., & Fang, S. (1994). Decision Surface Modeling of Textile Retail Operations using Neural Network. Proceedings of the Annual Fuzzy Theory and Technology International Conference, 312–315. Berkstresser, G., Fang, S., Hunter, A., Nuttle, H. L. W., King, R., & Wilson, J. (1994). Modeling Textile, Apparel, Retail Operations and Interactions. In S. Kawasbata & M. Niwa (Eds.), Proceedings of the 23rd Textile Research Symposium at Mt. Fuji. Fang, S.-C., & Puthenpura, S. (1994). Numerical linear algebra and optimization–volume 1, by Philip E. Gill. Walter Murray, and Margaret H. Wright, Addison-Wesley, Redwood City, CA, 1991, 448 pp. Price: $46.25 [Review of Numerical linear algebra and optimization, by P. E. Gill, W. Murray, & M. H. Wright]. Networks, 24(2), 128–129. https://doi.org/10.1002/net.3230240218 Fang, S.-C., Lin, C.-J., & Wu, S.-Y. (1994). On solving convex quadratic semi-infinite programming probelms. Optimization, 31(2), 107–125. https://doi.org/10.1080/02331939408844009 Fang, S. C., & Tsao, H. S. J. (1994). A quadratically convergent global algorithm for the linearly-constrained minimum cross-entropy problem. European Journal of Operational Research, 79(2), 369–378. https://doi.org/10.1016/0377-2217(94)90365-4 Sheu, R. L., & Fang, S. C. (1994). On the generalized path-following methods for linear programming. Optimization, 30(3), 235–249. https://doi.org/10.1080/02331939408843987 Fang, S.-cherng., & Wu, S.-yi. (1994). An inexact approach to solving linear semi-infinite programming problems. Optimization, 28(3-4), 291–299. https://doi.org/10.1080/02331939408843923 Lin, C.-J., Fang, S.-C., & Wu, S.-Y. (1994). A Dual Affine Scaling Based Algorithm for Solving Linear Semi-Infinite Programming Problems. In D. Z. Du & J. Sun (Eds.), Advances in Optimization and Approximation (pp. 217–234). https://doi.org/10.1007/978-1-4613-3629-7_11 Goodridge, S. G., Luo, R. C., & Kay, M. G. (1994). Multi-layered fuzzy behavior fusion for real-time control of systems with many sensors. IEEE International Conference on Multisensor Fusion and Integration for Intelligent Systems, 272–279. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0-0028699308&partnerID=MN8TOARS Luo, R. C., Kay, M. G., & Lee, W. G. (1994). Future trends in multisensor integration and fusion. IEEE International Symposium on Industrial Electronics, 7–12. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0-0028756683&partnerID=MN8TOARS Janet, J. A., Luo, R. C., & Kay, M. G. (1994). Autonomous mobile robot motion planning enhanced with extended configuration-space and half-planes. IECON Proceedings (Industrial Electronics Conference), 2, 1088–1093. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0-0028753404&partnerID=MN8TOARS Joines, J. A., & Roberts, S. D. (1994). Design of object-oriented simulations in C++. Simulation Conference Proceedings, 1994. Winter, 157–165. https://doi.org/10.1145/256562.256574 Joines, J. A., & Roberts, S. D. (1994). Design of object-oriented simulations using C++. In J. D. Tew, S. Manivannan, D. A. Sadowski, & F. Seila (Eds.), Proceedings of the 1994 Winter Simulation Conference (pp. 156–165). Piscataway, New Jersey: Institute of Electrical and Electronics Engineers. MARCELLINLITTLE, D. J., DEYOUNG, D. J., FERRIS, K. K., & BERRY, C. M. (1994). INCOMPLETE OSSIFICATION OF THE HUMERAL CONDYLE IN SPANIELS. VETERINARY SURGERY, 23(6), 475–477. https://doi.org/10.1111/j.1532-950X.1994.tb00509.x