Edward P. Fitts Department of Industrial & Systems Engineering - 1992 Uzsoy, R. (1992, November). Decomposition Algorithms for Scheduling Complex Dynamic Job Shops. Presented at the Arizona State University. Avramidis, A., O'Cinneide, C. A., Uzsoy, R., & Vitharana, P. (1992, November). Exact and Approximate Algorithms for Scheduling Batch Processing Machines. Presented at the ORSA/TIMS Joint National Meeting, San Francisco, CA. Church, L. K., Ovacik, I. M., & Uzsoy, R. (1992, November). A Shifting Bottleneck Methodology for Dynamic Job Shops. Presented at the ORSA/TIMS Joint National Meeting, San Francisco, CA. Church, L. K., & Uzsoy, R. (1992). Analysis of Periodic and Event-Driven Rescheduling Policies in Dynamic Shops. In G. A. Klutke, D. A. Mitta, B. O. Ninaji, & L. M. Seiford (Eds.), Proceedings of the First Industrial Engineering Research Conference (pp. 395–399). Uzsoy, R., & Ovacik, I. (1992, January). A Scheduling System Architecture for Semiconductor Testing Facilities. Presented at the Workshop on Machine Learning and Scheduling, College of Business Administration, University of Florida, Gainesville, Florida. Ovacik, I., & Uzsoy, R. (1992, April). A Scheduling System Architecture for Semiconductor Testing Operations. Presented at the TIMS/ORSA Joint National Meeting, Orlando, FL. Chandru, V., Lee, C. Y., & Uzsoy, R. (1992, April). Minimizing Total Completion Time on Batch Processing Machines. Presented at the TIMS/ORSA Joint National Meeting, Orlando, FL. Morris, S. E., Ovacik, I., & Uzsoy, R. (1992, April). A Simulated Annealing Approach to Single-Machine Scheduling with Sequence-Dependent Setup Times. Presented at the TIMS/ORSA Joint National Meeting, Orlando, FL. Uzsoy, R. (1992, April). A Scheduling System Architecture for Semiconductor Testing Facilities. Presented at the University of Michigan. Church, L. K., & Uzsoy, R. (1992, April). Analysis of Periodic and Event-Driven Rescheduling Policies in Dynamic Shops. Presented at the TIMS/ORSA Joint National Meeting, Orlando, FL. Uzsoy, R. (1992, August). A Scheduling System Architecture for Semiconductor Testing Facilities. Presented at the SRC/DARPA CIM/IC Workshop, Stanford University. Lee, C. Y., Martin-Vega, L. A., & Uzsoy, R. (1992, June). Decision Support System for Dynamic Job Shop Scheduling. Presented at the EURO/TIMS Joint International Conference, Helsinki, Finland. Uzsoy, R. (1992, August). Production Planning and Scheduling in the Semiconductor Industry. Presented at the Intel Corporation, Chandler, AZ. Traub, R., Chand, S., & Uzsoy, R. (1992, November). Rolling Horizon Algorithms for Scheduling Problems with Dynamic Arrivals. Presented at the ORSA/TIMS Joint National Meeting, San Francisco, CA. Uzsoy, R., Church, L. K., Ovacik, I. M., & Hinchman, J. (1992). Dispatching Rules For Semiconductor Testing Operations: A Computational Study. Thirteenth IEEE/CHMT International Electronics Manufacturing Technology Symposium, 272–276. https://doi.org/10.1109/iemt.1992.639903 Lee, C.-Y., & Uzsoy, R. (1992). A new dynamic programming algorithm for the parallel machines total weighted completion time problem. Operations Research Letters, 11(2), 73–75. https://doi.org/10.1016/0167-6377(92)90035-2 Ulusoy, G., & Uzsoy, R. (1992). Computer-Aided Process Planning and Material Requirements Planning: First Steps towards Computer-Integrated Manufacturing. Interfaces, 22(2), 76–86. https://doi.org/10.1287/inte.22.2.76 Uzsoy, R., Lee, C.-Y., Martin-Vega, L. A., & Hinchman, J. (1992). Scheduling Semiconductor Test Operations: Optimization and Approximation. https://doi.org/10.1007/978-3-642-77537-6_11 Church, L. K., & Uzsoy, R. (1992). Analysis of periodic and event-driven rescheduling policies in dynamic shops. International Journal of Computer Integrated Manufacturing, 5(3), 153–163. https://doi.org/10.1080/09511929208944524 Uzsoy, R., Lee, C. Y., & Martin Vega, L. A. (1992). A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING. IIE Transactions, 24(4), 47–60. https://doi.org/10.1080/07408179208964233 Ovacik, I. M., & Uzsoy, R. (1992). A shifting bottleneck algorithm for scheduling semiconductor testing operations. Journal of Electronics Manufacturing, 02(03), 119–134. https://doi.org/10.1142/s0960313192000157 Lee, C.-Y., Uzsoy, R., & Martin-Vega, L. A. (1992). Efficient Algorithms for Scheduling Semiconductor Burn-In Operations. Operations Research, 40(4), 764–775. https://doi.org/10.1287/opre.40.4.764 Uzsoy, R., Lee, C.-Y., & Martin-Vega, L. A. (1992). Scheduling semiconductor test operations: Minimizing maximum lateness and number of tardy jobs on a single machine. Naval Research Logistics, 39(3), 369–388. https://doi.org/10.1002/1520-6750(199204)39:3<369::aid-nav3220390307>3.0.co;2-f Fang, S. (1992). Introduction to Optical Fiber Communications (2nd ed.). R.O.C., Taiwan: National Translation and Compiler Bureau of Taiwan. Rajasekera, J. R., & Fang, S. C. (1992). Deriving an unconstrained convex program for linear programming. Journal of Optimization Theory and Applications, 75(3), 603–612. https://doi.org/10.1007/bf00940495 Tsao, H. S. J., Fang, S. C., & Lee, D. N. (1992). On the optimal entropy analysis. European Journal of Operational Research, 59(2), 324–329. https://doi.org/10.1016/0377-2217(92)90149-4 Sheu, R.-L., & Fang, S.-C. (1992). Insights into the interior-point methods. Zeitschrift Für Operations Research, 36(3), 227–257. https://doi.org/10.1007/bf01415890 Fang, S.-C. (1992). An unconstrained convex programming view of linear programming. Zeitschrift Für Operations Research, 36(2), 149–161. https://doi.org/10.1007/bf01417214 Fang, S. C., Peterson, E. L., & Rajasekera, J. R. (1992). Minimum cross-entropy analysis with entropy-type constraints. Journal of Computational and Applied Mathematics, 39(2), 165–178. https://doi.org/10.1016/0377-0427(92)90127-j Kay, M. G., & Luo, R. C. (1992). Selection of sensor-based free-ranging AGV systems. IEEE International Conference on Emerging Technologies and Factory Automation, ETFA, 1992-August, 184–189. https://doi.org/10.1109/ETFA.1992.683250 Kay, M. G., & Luo, R. C. (1992). Camera Placement for Global Vision. IEEE International Conference on Intelligent Robots and Systems, 2, 917–924. https://doi.org/10.1109/IROS.1992.594502 Hunter, N. A., King, R. E., & Nuttle, H. L. W. (1992). An Apparel-supply System for QR Retailing. Journal of the Textile Institute, 83(3), 462–471. https://doi.org/10.1080/00405009208631220 Deleersnyder, J. L., Hodgson, T. J., King, R. E., O'grady, P. J., & Savva, A. (1992). Integrating kanban type pull systems and MRP type push systems: Insights from a Markovian model. IIE Transactions, 24(3), 43–56. https://doi.org/10.1080/07408179208964223 Joines, J. A., Powell, K. A., & Roberts, S. D. (1992). Object-oriented modeling and simulation with C++. Proceedings of the 24th conference on Winter simulation - WSC '92. https://doi.org/10.1145/167293.167321 Hodge, G. L., Canada, J. R., & Masri, W. (1992). Low cost microcomputer software for multi-attribute decision analysis. Engineering Economist, 37(2). https://doi.org/10.1080/00137919208903068