Edward P. Fitts Department of Industrial & Systems Engineering - 1998 Rock, C., Qiu, J., & Okazaki, K. (1998). Electro-Discharge of Nanocrystalline Nb-Al Powders Produced by Mechanical Alloying. Journal of Materials Science, 33(1), 241–246. https://doi.org/10.1023/A:1004386822343 O’Donovan, R., McKay, K. N., & Uzsoy, R. (1998, April). Predictable Scheduling of a Single Machine with Breakdowns and Sensitive Jobs. Presented at the INFORMS National Meeting, Montreal, Canada. Rardin, R. L., & Uzsoy, R. (1998, April). Empirical Evaluation of Heuristics: A Tutorial. Presented at the INFORMS National Meeting, Montreal, Canada. Demirkol, E., Uzsoy, R., & Wang, C. S. (1998). Decomposition Procedures for Scheduling Complex Job Shops. Proceedings of the Sixth International Workshop on Project Management and Scheduling. Presented at the Sixth International Workshop on Project Management and Scheduling. Uzsoy, R., & Venkatachalam, G. (1998). Supply Chain Management for Companies with Product Recovery and Remanufacturing Capability. International Journal of Environmentally Conscious Design and Manufacturing, 7, 59–72. Uzsoy, R., & Mehta, S. V. (1998, March). Predictable Scheduling of Job Shops Subject To Machine Breakdowns. Presented at the School of Chemical Engineering, Purdue University. Uzsoy, R. (1998, April). A Senior Design Course with Industrial Experience. Presented at the Central Indiana Chapter, Institute of Industrial Engineers. Teyner, T., & Uzsoy, R. (1998, May). Management of Spare Parts Inventories in a Wafer Fabrication Facility. Presented at the Harris Semiconductor, Melbourne, FL. Uzsoy, R. (1998, November). Maintenance Management Problems in a Semiconductor Wafer Fabrication Facility. Presented at the Department of Industrial Engineering, Texas A&M University. Hughes, J. C., Neudeck, G. W., & Uzsoy, R. (1998). Effects of epitaxial silicon technology on the manufacturing performance of wafer fabrication lines. Twenty Third IEEE/CPMT International Electronics Manufacturing Technology Symposium (Cat. No.98CH36205). Presented at the Twenty Third IEEE/CPMT International Electronics Manufacturing Technology Symposium. 1998 IEMT Symposium. https://doi.org/10.1109/iemt.1998.731090 Avramidis, A. N., Healy, K. J., & Uzsoy, R. (1998). Control of a batch-processing machine: A computational approach. International Journal of Production Research, 36(11), 3167–3181. https://doi.org/10.1080/002075498192355 Demirkol, E., Mehta, S., & Uzsoy, R. (1998). Benchmarks for shop scheduling problems. European Journal of Operational Research, 109(1), 137–141. https://doi.org/10.1016/s0377-2217(97)00019-2 Mehta, S. V., & Uzsoy, R. M. (1998). Predictable scheduling of a job shop subject to breakdowns. IEEE Transactions on Robotics and Automation, 14(3), 365–378. https://doi.org/10.1109/70.678447 Mosley, S. A., Teyner, T., & Uzsoy, R. M. (1998). Maintenance scheduling and staffing policies in a wafer fabrication facility. IEEE Transactions on Semiconductor Manufacturing, 11(2), 316–323. https://doi.org/10.1109/66.670182 Mehta, S. V., & Uzsoy, R. (1998). Minimizing total tardiness on a batch processing machine with incompatible job families. IIE Transactions, 30(2), 165–178. https://doi.org/10.1080/07408179808966448 Kempf, K. G., Uzsoy, R., & Wang, C.-S. (1998). Scheduling a single batch processing machine with secondary resource constraints. Journal of Manufacturing Systems, 17(1), 37–51. https://doi.org/10.1016/s0278-6125(98)80008-3 Toktay, L. B., & Uzsoy, R. (1998). A capacity allocation problem with integer side constraints. European Journal of Operational Research, 109(1), 170–182. https://doi.org/10.1016/s0377-2217(98)80011-8 Nuttle, H. L. W., Fang, S.-C., Wang, D.-W., & Donovan, M. (1998). Multicustomer Due-Date Bargainer [Software]. Raleigh, NC: North Carolina State University. Reynolds, K. T. (1998). Cellular manufacturing & the concept of total quality. Computers and Industrial Engineering, 35(1-2), 89–92. https://doi.org/10.1016/S0360-8352(98)00027-8 Janet, J. A., White, M. W., Kay, M. G., Sutton, J. C., & Brickley, J. J. (1998). Fusing a hyper-ellipsoid clustering Kohonen network with the Julier-Uhlmann-Kalman filter for autonomous mobile robot map building and tracking. Proceedings - IEEE International Conference on Robotics and Automation, 2, 1405–1410. https://doi.org/10.1109/ROBOT.1998.677301 Houck, C. R. (1998). The genetic algorithm optimization toolbox (GAOT) for Matlab 5. Http://Www. Ie. Ncsu. Edu/Mirage/GAToolBox/Gaot. Joines, J. A., King, R. E., & Culbreth, C. T. (1998). Cell Formation Using Genetic Algorithms. Group Technology and Cellular Manufacturing, pp. 185–204. https://doi.org/10.1007/978-1-4615-5467-7_11 Lo, S. Z., Makrucki, B. A., Bilbro, G. L., & Elmaghraby, S. E. (1998). Call admission control schemes and ATM network topological design. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 111(2), 393–404. https://doi.org/10.1016/S0377-2217(97)00320-2 Kuhl, M. E., Damerdji, H., & Wilson, J. R. (1998). Least squares estimation of nonhomogeneous Poisson processes. 1998 Winter Simulation Conference: Proceedings: Grand Hotel, Washington, D.C., 13-16 December, 1998, 637–646. https://doi.org/10.1109/wsc.1998.745045 Humphrey, D. G., & Wilson, J. R. (1998). A revised simplex search procedure for stochastic simulation response-surface optimization. 1998 Winter Simulation Conference: Proceedings: Grand Hotel, Washington, D.C., 13-16 December, 1998, 751–760. https://doi.org/10.1109/wsc.1998.745060 Avramidis, A. N., & Wilson, JR. (1998). Correlation-induction techniques for estimating quantiles in simulation experiments. OPERATIONS RESEARCH, 46(4), 574–591. https://doi.org/10.1287/opre.46.4.574 Fang, S. C., & Kao, C. (1998). Quantitative management techniques and application in Taiwan. International Journal of Operations and Quantitative Management, 4(3). Fang, S.-C., Chiu, N. C., & Lee, Y. S. (1998). Operation scheduling of mill/turn machining centers with genetic algorithms. Proceedings of the Fourth Joint Conference of Information Sciences. 1998, 2(1998), 437–440. Fang, S.-C., Donovan, M., Nuttle, H., & Wilson, J. (1998). Multi-customer due-date bargaining with soft computing. Proceedings of the Fourth Joint Conference of Information Sciences. 1998, 2(1998), 84–87. Wilson, J. R., Carson, J. S., & Manivannan, M. (1998). The Winter Simulation Conference: The premier forum on simulation practice and theory. OR/MS Today, 25(4), 29–31. Damerdji, H., & Glynn, P. W. (1998). Limit theory for performance modeling of future event set algorithms. MANAGEMENT SCIENCE, 44(12), 1709–1722. https://doi.org/10.1287/mnsc.44.12.1709 Lee, Y. S., & Koc, B. (1998). Ellipse-offset approach and inclined zig-zag method for multi-axis roughing of ruled surface pockets. COMPUTER-AIDED DESIGN, 30(12), 957–971. https://doi.org/10.1016/S0010-4485(98)00051-7 Koksal, G., & Fathi, Y. (1998). Design of economical noise array experiments for a partially controlled simulation environment. Computers & Industrial Engineering, 35(3-4), 555–558. https://doi.org/10.1016/S0360-8352(98)00157-0 Guan, S. H., & Fang, S. C. (1998). A global-filtering algorithm for linear programming problems with stochastic elements. MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 48(3), 287–316. https://doi.org/10.1007/s001860050029 Sommerich, C. M., & Mirka, G. A. (1998). Managing work-related musculoskeletal injuries. In W. Karwowski & G. Salvendy (Eds.), Ergonomics in manufacturing: Raising productivity through workplace improvement (Ch. 19). Dearborn, Mich.: Society of Manufacturing Engineers; Norcross, Ga.: Engineering & Management Press. Chen, Y. H., & Fang, S. C. (1998). Solving convex programming problems with equality constraints by neural networks. COMPUTERS & MATHEMATICS WITH APPLICATIONS, 36(7), 41–68. https://doi.org/10.1016/S0898-1221(98)00172-2 Ress, D. A., & Young, R. E. (1998). A distributed fuzzy constraint satisfaction system with context-based reasoning. INTERNATIONAL JOURNAL OF HUMAN-COMPUTER STUDIES, 48(3), 393–407. https://doi.org/10.1006/ijhc.1997.0177 Turville, K. L., Psihogios, J. P., Ulmer, T. R., & Mirka, G. A. (1998). The effects of video display terminal height on the operator: a comparison of the 15 degrees and 40 degrees recommendations. APPLIED ERGONOMICS, 29(4), 239–246. https://doi.org/10.1016/S0003-6870(97)00048-3 Wu, S. Y., Fang, S.-C., & Lin, C. J. (1998). Relaxed cutting plane method for solving linear semi-infinite programming problems. Journal of Optimization Theory and Applications, 99(3), 759–779. https://doi.org/10.1023/A:1021763419562 Chen, Y. H., Lee, Y. S., & Fang, S. C. (1998). Optimal cutter selection and machining plane determination for process planning and NC machining of complex surfaces. JOURNAL OF MANUFACTURING SYSTEMS, 17(5), 371–388. https://doi.org/10.1016/S0278-6125(98)80004-6 Marcellin-Little, D. J., Ferretti, A., Roe, S. C., & DeYoung, D. J. (1998). Hinged ilizarov external fixation for correction of antebrachial deformities. VETERINARY SURGERY, Vol. 27, pp. 231–245. https://doi.org/10.1111/j.1532-950X.1998.tb00122.x Seifert, R. W., Kay, M. G., & Wilson, JR. (1998). Evaluation of AGV routeing strategies using hierarchical simulation. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 36(7), 1961–1976. https://doi.org/10.1080/002075498193057 Ma, Y. W., & Lees, Y. S. (1998). Detection of loops and singularities of surface intersections. COMPUTER-AIDED DESIGN, 30(14), 1059–1067. https://doi.org/10.1016/S0010-4485(98)00056-6 Sommerich, C. M., Marras, W. S., & Parnianpour, M. (1998). A method for developing biomechanical profiles of hand-intensive tasks. Clinical Biomechanics (Bristol, Avon), 13(4-5), 261–271. Cormier, D., P O'Grady, & Sanii, E. (1998). A constraint-based genetic algorithm for concurrent engineering. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 36(6), 1679–1697. https://doi.org/10.1080/002075498193228 Koksal, G., Smith, W. A., Fathi, Y., Lu, J. C. Y., & McGregor, R. (1998). A case study in off-line quality control: characterization and optimization of batch dyeing process design. INTERNATIONAL JOURNAL OF TECHNOLOGY MANAGEMENT, 16(4-6), 358–382. https://doi.org/10.1504/IJTM.1998.002676 Lin, C. J., Fang, S. C., & Wu, S. Y. (1998). An unconstrained convex programming approach to linear semi-infinite programming. SIAM JOURNAL ON OPTIMIZATION, 8(2), 443–456. https://doi.org/10.1137/S105262349427621X Rovesti, G. L., Fluckiger, R., Margini, A., & Marcellin-Little, D. J. (1998). Fragmented coronoid process and incomplete ossification of the humeral condyle in a Rottweiler. Veterinary Surgery, 27(4), 354–357. https://doi.org/10.1111/j.1532-950X.1998.tb00139.x Li, G. Z., & Fang, S. C. (1998, May). Solving interval-valued fuzzy relation equations. https://doi.org/10.1109/91.669033 Lee, Y. S. (1998). Non-isoparametric tool path planning by machining strip evaluation for 5-axis sculptured surface machining. COMPUTER-AIDED DESIGN, 30(7), 559–570. https://doi.org/10.1016/S0010-4485(98)00822-7 Lee, Y. S. (1998). Mathematical modelling using different endmills and tool placement problems for 4- and 5-axis NC complex surface machining. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 36(3), 785–814. https://doi.org/10.1080/002075498193697 Hu, C. F., & Fang, S. C. (1998). Solving fuzzy inequalities with concave membership functions. FUZZY SETS AND SYSTEMS, 99(2), 233–240. https://doi.org/10.1016/S0165-0114(97)00013-4 Hodgson, T. J., Cormier, D., Weintraub, A. J., & Zozom, A. (1998). Note. Satisfying due dates in large job shops. MANAGEMENT SCIENCE, 44(10), 1442–1446. https://doi.org/10.1287/mnsc.44.10.1442 Huang, J.-C., Culbreth, C. T., Joines, J. A., King, R. E., & Hodgson, T. G. (1998). Decision support system for lumber procurement and dry kiln scheduling. Forest Products Journal, 48(9), 51–59. Wang, H. F., & Liao, H. L. (1998). Fuzzy resolution on the infeasibility of variational inequality. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 106(1), 198–203. https://doi.org/10.1016/S0377-2217(98)00312-9 Wang, D. W., Fang, S. C., & Hodgson, T. J. (1998). A fuzzy due-date bargainer for the make-to-order manufacturing systems. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 28(3), 492–497. https://doi.org/10.1109/5326.704596