Edward P. Fitts Department of Industrial & Systems Engineering - 1999 Uzsoy, R. (1999). Production Engineering. In McGraw-Hill Encyclopedia of Science and Technology. McGraw-Hill. Horiguchi, K., Uzsoy, R., & Venkateswaran, S. (1999). A Fast Approximation Algorithm for Cycle Time Estimation in Wafer Fabrication Facilities. Proceedings of the 8th Industrial Engineering Research Conference. Presented at the 8th Industrial Engineering Research Conference, Phoenix, AZ. Uzsoy, R. (1999, March). Current and Future Trends and Scheduling Semiconductor Manufacturing Systems. Presented at the Applied Materials Scheduling Summit, Applied Materials, San Jose, CA. Aytug, H., & Uzsoy, R. (1999, November). A Scheduling Architecture for Semiconductor Manufacturing. Presented at the Intel Corporation, Chandler, AZ. Meacham, A., Uzsoy, R., & Venkatadri, U. (1999). Optimal disassembly configurations for single and multiple products. Journal of Manufacturing Systems, 18(5), 311–322. https://doi.org/10.1016/s0278-6125(00)87634-7 O'Donovan, R., Uzsoy, R., & McKay, K. N. (1999). Predictable scheduling of a single machine with breakdowns and sensitive jobs. International Journal of Production Research, 37(18), 4217–4233. https://doi.org/10.1080/002075499189745 Woo, M., Uzsoy, R., & Ghafoor, A. (1999). Media Streams Scheduling for Synchronization in Distributed Multimedia Systems. Journal of Parallel and Distributed Computing, 56(3), 272–295. https://doi.org/10.1006/jpdc.1998.1526 Mehta, S. V., & Uzsoy, R. (1999). Predictable scheduling of a single machine subject to breakdowns. International Journal of Computer Integrated Manufacturing, 12(1), 15–38. https://doi.org/10.1080/095119299130443 Lee, C.-Y., & Uzsoy, R. (1999). Minimizing makespan on a single batch processing machine with dynamic job arrivals. International Journal of Production Research, 37(1), 219–236. https://doi.org/10.1080/002075499192020 Uzsoy, R. (1999). A review of: “The Planning and Scheduling of Production Systems” Edited by A. Arbita and S.E. Elmaghraby Chapman and Hall, 1997, 367 pages, ISBN 0-412-61020-5 [Review of Planning and Scheduling of Production Systems, by A. Artiba & S. E. Elmaghraby]. IIE Transactions, 31(2), 190–193. https://doi.org/10.1080/07408179908969819 Hodgson, T. J., Kay, M. G., Mittal, R. O., & Tang, S.-Y. I. (1999). Evaluation of cylindricity using combinatorics. IIE Transactions (Institute of Industrial Engineers), 31(1), 39–47. https://doi.org/10.1023/A:1007572617551 Joines, J. A., & Culbreth, C. T. (1999). A hybrid-GA approach for dry-kiln scheduling and inventory control. In N. Tawara, H. Hwang, W. Xu, & M. Gen (Eds.), Proceedings of the Second Asia-Pacific Conference on Industrial Engineering and Management Systems (pp. 193–196). Kanazawa, Japan. Joines, J. A., Culbreth, C. T., & King, R. E. (1999). A demand-based hybrid-GA approach for manufacturing cell design. In N. Tawara, H. Hwang, W. Xu, & M. Gen (Eds.), Proceedings of the Second Asia-Pacific Conference on Industrial Engineering and Management Systems (pp. 193–196). Kanazawa, Japan. King, R., & Moon, K. (1999). Quick response replenishment: A case study. 1999 Winter Simulation Conference: proceedings: Pointe Hilton Squaw Peak Resort, Phoenix, AZ, U.S.A., 5-8 December 1999, 2, 1341–1349. https://doi.org/10.1109/wsc.1999.816863 Elmaghraby, S. E., & Thoney, K. A. (1999). The two-machine stochastic flowshop problem with arbitrary processing time distributions. IIE Transactions, 31(5), 467–477. https://doi.org/10.1023/A:1007697625481 Fang, S.-C., Wang, D.-W., & Nuttle, H. (1999). Fuzzy rule quantification and its application in fuzzy due-date bargaining. Proceedings of the 8th International Fuzzy Systems Association World Congress. August 1999, (1999 Aug.). Piscataway, N.J.: IEEE. Marcellin-Little, D. J. (1999). Fracture treatment with circular external fixation. VETERINARY CLINICS OF NORTH AMERICA-SMALL ANIMAL PRACTICE, 29(5), 1153-+. https://doi.org/10.1016/S0195-5616(99)50107-1 Yaghubian, A. R., Hodgson, T. J., Joines, J. A., Culbreth, C. T., & Huang, J. C. (1999). Dry kiln scheduling in furniture production. IIE Transactions, 31(8), 733–738. https://doi.org/10.1080/07408179908969872 Fang, S.-C., Wu, P.-T., & Nuttle, H. (1999). Curved search based neural network learning using fuzzy control. Proceedings of the 8th International Fuzzy Systems Association World Congress. August 1999, (1999 Aug.). Piscataway, N.J.: IEEE. Fang, S.-C., Hung, T.-W., & Nuttle, H. (1999). An easily implemented approach to fuzzy systems identification. In T. S. R. N. Dave (Ed.), 18th International Conference of the North American Fuzzy Information Processing Society--NAFIPS: June 10-12, 1999, New York, N.Y., U.S.A. New York, N.Y.; Piscataway, N.J.: IEEE. Fang, S.-C., Chen, S.-H., Wu, P.-T., Huang, M., & Nuttle, H. (1999). A fuzzy expert system for a wave soldering process. Proceedings of the 8th International Fuzzy Systems Association World Congress. August 1999, (1999 Aug.). Piscataway, N.J.: IEEE. Fang, S.-C., Hung, T.-W., & Nuttle, H. (1999). A clustering-based approach to fuzzy systems identification. Proceedings of the 8th International Fuzzy Systems Association World Congress, August 1999, (1999 Aug.). Piscataway, N.J.: IEEE. Ohno, K., Jin, Z. H., & Elmaghraby, S. E. (1999). An optimal assembly mode of multi-type printed circuit boards. COMPUTERS & INDUSTRIAL ENGINEERING, 36(2), 451–471. https://doi.org/10.1016/S0360-8352(99)00142-4 Hu, C. F., & Fang, S. C. (1999). Solving fuzzy inequalities with piecewise linear membership functions. IEEE TRANSACTIONS ON FUZZY SYSTEMS, 7(2), 230–235. https://doi.org/10.1109/91.755403 Chiou, C. J., & Lee, Y. S. (1999). A shape-generating approach for multi-axis machining G-buffer models. COMPUTER-AIDED DESIGN, 31(12), 761–776. https://doi.org/10.1016/S0010-4485(99)00069-X Sommerich, C. M. (1999). Upper extermity supports. In W. Karwowski & W. S. Marras (Eds.), The industrial ergonomics handbook: Ch. 77. Boca Raton, CRC Press. Glasscock, N. F., Turville, K. L., Joines, S. B., & Mirka, G. A. (1999). The effect of personality type on muscle coactivation during elbow flexion. HUMAN FACTORS, 41(1), 51–60. https://doi.org/10.1518/001872099779577318 Weintraub, A., Cormier, D., Hodgson, T., King, R., Wilson, J., & Zozom, A. (1999). Scheduling with alternatives: a link between process planning and scheduling. IIE Transactions, 31(11), 1093–1102. https://doi.org/10.1080/07408179908969910 Taylor, J. B., Carrano, A. L., & Lemaster, R. L. (1999). Quantification of process parameters in a wood sanding operation. Forest Products Journal, 49(5), 41–46. Hodgson, T., King, R. E., Thoney, K., Stanislaw, N., Weintraub, A. J., & Zozom, A. (1999). On satisfying due-dates in large job shops: Idle time insertion. IIE Transactions, 32(2), 177–180. https://doi.org/10.1080/07408170008963890 Sommerich, C. M. (1999). Economic analysis for ergonomics programs. In W. Karwowski & W. S. Marras (Eds.), The occupational ergonomics handbook: Ch. 83. Boca Raton, CRC Press. Loetamonphong, J., & Fang, S. C. (1999). An efficient solution procedure for fuzzy relation equations with max-product composition. IEEE TRANSACTIONS ON FUZZY SYSTEMS, 7(4), 441–445. https://doi.org/10.1109/91.784204 Hodgson, T., Kay, M. G., Mittal, R. O., & Tang, S. Y. (1999). Evaluation of cylindricity using combinatorics. IIE Transactions, 31(1), 39–47. https://doi.org/10.1080/07408179908969804 Lee, Y. S. (1999). Adaptive tool path planning for 5-axis sculptured surface machining by machining strip evaluation. In B. K. C. G. J. Olling & R. B. Jerard (Eds.), Machining impossible shapes: IFIP TC5 WG5.3 International Conference on Sculptured Surfaces (SSM98), November 5-11, 1998, Chrysler Technology Center, Michigan (pp. 351–360). Boston: Kluwer Academic. Fang, S. C., & Li, G. Z. (1999). Solving fuzzy relation equations with a linear objective function. FUZZY SETS AND SYSTEMS, 103(1), 107–113. https://doi.org/10.1016/S0165-0114(97)00184-X Marcellin-Little, D. J., DeYoung, D. J., Thrall, D. E., & Merrill, C. L. (1999). Osteosarcoma at the site of bone infarction associated with total hip arthroplasty in a dog. VETERINARY SURGERY, 28(1), 54–60. https://doi.org/10.1053/jvet.1999.0054 Fang, S. C., Hu, C. F., Wang, H. F., & Wu, S. Y. (1999). Linear programming with fuzzy coefficients in constraints. COMPUTERS & MATHEMATICS WITH APPLICATIONS, 37(10), 63–76. https://doi.org/10.1016/S0898-1221(99)00126-1 Marcellin-Little, D. J., DeYoung, B. A., Doyens, D. H., & DeYoung, D. J. (1999). Canine uncemented porous-coated anatomic total hip arthroplasty: Results of a long-term prospective evaluation of 50 consecutive cases. VETERINARY SURGERY, Vol. 28, pp. 10–20. https://doi.org/10.1053/jvet.1999.0010 Wang, D. W., Fang, S. C., & Nuttle, H. L. W. (1999). Soft computing for multicustomer due-date bargaining. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 29(4), 566–575. https://doi.org/10.1109/5326.798770 Fang, S.-C., Wang, D.-W., Chen, S.-H., & Nuttle, H. (1999). A new fuzzy due-date bargainer with soft computing. Proceedings of the 8th International Fuzzy Systems Association World Congress. August 1999, (1999 Aug.). Piscataway, N.J.: IEEE. Lee, Y. S., & Chiou, C. J. (1999). Unfolded projection approach to machining non-coaxial parts on mill-turn machines. COMPUTERS IN INDUSTRY, 39(2), 147–173. https://doi.org/10.1016/S0166-3615(98)00140-7 Wu, S. Y., & Fang, S. C. (1999). Solving convex programs with infinitely many linear constraints by a relaxed cutting plane method. COMPUTERS & MATHEMATICS WITH APPLICATIONS, 38(3-4), 23–33. https://doi.org/10.1016/S0898-1221(99)00203-5 Chiu, N. C., Fang, S. C., & Lee, Y. S. (1999). Sequencing parallel machining operations by genetic algorithms. COMPUTERS & INDUSTRIAL ENGINEERING, 36(2), 259–280. https://doi.org/10.1016/S0360-8352(99)00132-1 Elmaghraby, S. E., Fathi, Y., & Taner, M. R. (1999). On the sensitivity of project variability to activity mean duration. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 62(3), 219–232. https://doi.org/10.1016/S0925-5273(98)00241-2 Chow, M.-Y., Lee, Y.-S., & Trussell, H. J. (1999). Motor incipient fault detection using artificial neural. In J. Lee & B. Wang (Eds.), Computer-aided maintenance: methodologies and practices (Manufacturing systems engineering series ; 5). (pp. 263–280). https://doi.org/10.1007/978-1-4615-5305-2_12 Lee, Y. S., Daftari, D. M., & Krishnaswami, P. (1999). Application of virtual convex polytope in transforming protrusions for automated process planning. COMPUTERS & INDUSTRIAL ENGINEERING, 36(1), 67–96. https://doi.org/10.1016/S0360-8352(99)00002-9 Hu, C.-F., & Fang, S.-C. (1999). A relaxed cutting plane algorithm for solving fuzzy inequality systems. Optimization, 45(1-4), 89–106. https://doi.org/10.1080/02331939908844428