Operations Research - 1992 Avramidis, A., O'Cinneide, C. A., Uzsoy, R., & Vitharana, P. (1992, November). Exact and Approximate Algorithms for Scheduling Batch Processing Machines. Presented at the ORSA/TIMS Joint National Meeting, San Francisco, CA. Chandru, V., Lee, C. Y., & Uzsoy, R. (1992, April). Minimizing Total Completion Time on Batch Processing Machines. Presented at the TIMS/ORSA Joint National Meeting, Orlando, FL. Church, L. K., & Uzsoy, R. (1992). Analysis of Periodic and Event-Driven Rescheduling Policies in Dynamic Shops. In G. A. Klutke, D. A. Mitta, B. O. Ninaji, & L. M. Seiford (Eds.), Proceedings of the First Industrial Engineering Research Conference (pp. 395–399). Church, L. K., & Uzsoy, R. (1992). Analysis of periodic and event-driven rescheduling policies in dynamic shops. International Journal of Computer Integrated Manufacturing, 5(3), 153–163. https://doi.org/10.1080/09511929208944524 Church, L. K., & Uzsoy, R. (1992, April). Analysis of Periodic and Event-Driven Rescheduling Policies in Dynamic Shops. Presented at the TIMS/ORSA Joint National Meeting, Orlando, FL. Church, L. K., Ovacik, I. M., & Uzsoy, R. (1992, November). A Shifting Bottleneck Methodology for Dynamic Job Shops. Presented at the ORSA/TIMS Joint National Meeting, San Francisco, CA. Lee, C. Y., Martin-Vega, L. A., & Uzsoy, R. (1992, June). Decision Support System for Dynamic Job Shop Scheduling. Presented at the EURO/TIMS Joint International Conference, Helsinki, Finland. Lee, C.-Y., & Uzsoy, R. (1992). A new dynamic programming algorithm for the parallel machines total weighted completion time problem. Operations Research Letters, 11(2), 73–75. https://doi.org/10.1016/0167-6377(92)90035-2 Morris, S. E., Ovacik, I., & Uzsoy, R. (1992, April). A Simulated Annealing Approach to Single-Machine Scheduling with Sequence-Dependent Setup Times. Presented at the TIMS/ORSA Joint National Meeting, Orlando, FL. Ovacik, I., & Uzsoy, R. (1992, April). A Scheduling System Architecture for Semiconductor Testing Operations. Presented at the TIMS/ORSA Joint National Meeting, Orlando, FL. Roise, J. P., & Smith, W. D. (1992). Aggregation of Yields in Forest Planning. Proceedings of an ECE/FAO/ILO Seminar, 50–56. Traub, R., Chand, S., & Uzsoy, R. (1992, November). Rolling Horizon Algorithms for Scheduling Problems with Dynamic Arrivals. Presented at the ORSA/TIMS Joint National Meeting, San Francisco, CA. Ulusoy, G., & Uzsoy, R. (1992). Computer-Aided Process Planning and Material Requirements Planning: First Steps towards Computer-Integrated Manufacturing. Interfaces, 22(2), 76–86. https://doi.org/10.1287/inte.22.2.76 Uzsoy, R. (1992, April). A Scheduling System Architecture for Semiconductor Testing Facilities. Presented at the University of Michigan. Uzsoy, R. (1992, August). A Scheduling System Architecture for Semiconductor Testing Facilities. Presented at the SRC/DARPA CIM/IC Workshop, Stanford University. Uzsoy, R. (1992, August). Production Planning and Scheduling in the Semiconductor Industry. Presented at the Intel Corporation, Chandler, AZ. Uzsoy, R. (1992, November). Decomposition Algorithms for Scheduling Complex Dynamic Job Shops. Presented at the Arizona State University. Uzsoy, R., & Ovacik, I. (1992, January). A Scheduling System Architecture for Semiconductor Testing Facilities. Presented at the Workshop on Machine Learning and Scheduling, College of Business Administration, University of Florida, Gainesville, Florida. Uzsoy, R., Church, L. K., Ovacik, I. M., & Hinchman, J. (1992). Dispatching Rules For Semiconductor Testing Operations: A Computational Study. Thirteenth IEEE/CHMT International Electronics Manufacturing Technology Symposium, 272–276. https://doi.org/10.1109/iemt.1992.639903 Uzsoy, R., Lee, C.-Y., Martin-Vega, L. A., & Hinchman, J. (1992). Scheduling Semiconductor Test Operations: Optimization and Approximation. https://doi.org/10.1007/978-3-642-77537-6_11