Operations Research - 1997 Akcali, E., Hamlin, R. D., Teyner, T., Uzsoy, R., & Venkatachalam, G. (1997). Spare parts inventory management for semiconductor wafer fabrication facilities. 1997 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat. No.97CH36023). Presented at the 1997 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings. https://doi.org/10.1109/issm.1997.664484 Basten, C. J., Weir, B. S., & Zeng, Z.-B. (1997). QTL Cartographer: a reference manual and tutorial for QTL mapping. Department of Statistics, NC State University. Chand, S., Traub, R., & Uzsoy, R. (1997). Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates. Annals of Operations Research, 70, 115–125. https://doi.org/10.1023/a:1018961818782 Demirkol, E., & Uzsoy, R. (1997). Performance of Decomposition Methods for Complex Workshops Under Multiple Criteria. Proceedings of the 21st International Conference on Computers and Industrial Engineering. Presented at the 21st International Conference on Computers and Industrial Engineering, San Juan, PR. Demirkol, E., & Uzsoy, R. (1997, October). Decomposition Methods for Scheduling Complex Job Shops. Presented at the INFORMS National Meeting, Atlanta, GA. Demirkol, E., Mehta, S., & Uzsoy, R. (1997). A Computational Study of Shifting Bottleneck Procedures for Shop Scheduling Problems. Journal of Heuristics, 3(2), 111–137. https://doi.org/10.1023/a:1009627429878 Geiger, C. D., Hase, R., Takoudis, C. G., & Uzsoy, R. (1997). Alternative facility layouts for semiconductor wafer fabrication facilities. IEEE Transactions on Components, Packaging, and Manufacturing Technology: Part C, 20(2), 152–163. https://doi.org/10.1109/3476.622885 Geiger, C. D., Kempf, K. G., & Uzsoy, R. (1997). A Tabu search approach to scheduling an automated wet etch station. Journal of Manufacturing Systems, 16(2), 102–116. https://doi.org/10.1016/s0278-6125(97)85674-9 Heine, J. T., Li, Z., & McTigue, D. F. (1997). Front fixing vs. front tracking for diffusive transport with moving boundaries. International Journal for Numerical & Analytical Methods in Geomechanics, 21, 653–662. Kayton, D., Teyner, T., Schwartz, C., & Uzsoy, R. (1997). Focusing Maintenance Improvement Efforts in a Wafer Fabrication Facility Operating Under Theory of Constraints. Production and Inventory Management, (Fourth Quarter), 51–57. Li, Z. (1997). Immersed interface methods for moving interface problems. Numerical Algorithms, 14, 269–293. https://doi.org/10.1023/A:1019173215885 Li, Z., & Zheng, K. (1997). An Inverse Problem in a Parabolic Equation. Electronic Journal of Differential Equations, 1, 193–199. Tamer Unal, A., Uzsoy, R., & Kiran, A. S. (1997). Rescheduling on a Single Machine with Part Type Dependent Setup Times and Due Dates. Annals of Operations Research, 70, 93–113. https://doi.org/10.1023/a:1018955111939 Teyner, T., & Uzsoy, R. (1997, January). Dispatching and Maintenance Management in a Wafer Fab Operating Under Theory of Constraints. Presented at the Harris Semiconductor, Melbourne, FL. Uzsoy, R. (1997). Production Engineering. In McGraw-Hill Encyclopedia of Science and Technology (8th ed.). New York: McGraw-Hill. Uzsoy, R. (1997). Production planning for companies with product recovery and remanufacturing capability. Proceedings of the 1997 IEEE International Symposium on Electronics and the Environment. ISEE-1997. Presented at the 1997 IEEE International Symposium on Electronics and the Environment. ISEE-1997. https://doi.org/10.1109/isee.1997.605342 Uzsoy, R. (1997, November). Supply Chain Management in Electronics Manufacturing with Remanufacturing Capability. Presented at the NSF/Air Force Joint Research Review Workshop, Dayton, OH. Uzsoy, R. (1997, September). Disassembly Configurations and Supply Chain Management for Companies with Product Recovery and Remanufacturing. Presented at the Xerox Corporation, East Rochester, NY. Uzsoy, R., & Wang, C.-S. (1997). Decomposition procedures for global scheduling of complex job shops. Twenty First IEEE/CPMT International Electronics Manufacturing Technology Symposium Proceedings 1997 IEMT Symposium. Presented at the Twenty First IEEE/CPMT International Electronics Manufacturing Technology Symposium 1997 IEMT Symposium. https://doi.org/10.1109/iemt.1997.626955 Uzsoy, R., & Yang, Y. (1997). MINIMIZING TOTAL WEIGHTED COMPLETION TIME ON A SINGLE BATCH PROCESSING MACHINE. Production and Operations Management, 6(1), 57–73. https://doi.org/10.1111/j.1937-5956.1997.tb00415.x