Operations Research - 1998 Avramidis, A. N., Healy, K. J., & Uzsoy, R. (1998). Control of a batch-processing machine: A computational approach. International Journal of Production Research, 36(11), 3167–3181. https://doi.org/10.1080/002075498192355 Cho, G. E., & Ipsen, I. C. F. (1998). If a matrix has a single eigenvalue, how sensitive is this eigenvalue? (Technical Report No. CRSC-TR98-8). Raleigh, NC: Center for Research in Scientific Computation, Department of Mathematics, North Carolina State University. Demirkol, E., Mehta, S., & Uzsoy, R. (1998). Benchmarks for shop scheduling problems. European Journal of Operational Research, 109(1), 137–141. https://doi.org/10.1016/s0377-2217(97)00019-2 Demirkol, E., Uzsoy, R., & Wang, C. S. (1998). Decomposition Procedures for Scheduling Complex Job Shops. Proceedings of the Sixth International Workshop on Project Management and Scheduling. Presented at the Sixth International Workshop on Project Management and Scheduling. Gainey, K. W., & Roise, J. P. (1998, September 16). Wetlands Mitigation Optimization Model Using NC Crews. Presented at the Connections 98: National Conference on Transportation, Wetlands and the Natural Environment, New Bern, NC. Hughes, J. C., Neudeck, G. W., & Uzsoy, R. (1998). Effects of epitaxial silicon technology on the manufacturing performance of wafer fabrication lines. Twenty Third IEEE/CPMT International Electronics Manufacturing Technology Symposium (Cat. No.98CH36205). Presented at the Twenty Third IEEE/CPMT International Electronics Manufacturing Technology Symposium. 1998 IEMT Symposium. https://doi.org/10.1109/iemt.1998.731090 Ipsen, I. C. F. (1998). A note on the field of values of non-normal matrices (Technical Report No. CRSC-TR98-26). Raleigh, NC: Center for Research in Scientific Computation, Department of Mathematics, North Carolina State University. Kempf, K. G., Uzsoy, R., & Wang, C.-S. (1998). Scheduling a single batch processing machine with secondary resource constraints. Journal of Manufacturing Systems, 17(1), 37–51. https://doi.org/10.1016/s0278-6125(98)80008-3 Mehta, S. V., & Uzsoy, R. (1998). Minimizing total tardiness on a batch processing machine with incompatible job families. IIE Transactions, 30(2), 165–178. https://doi.org/10.1080/07408179808966448 Mehta, S. V., & Uzsoy, R. M. (1998). Predictable scheduling of a job shop subject to breakdowns. IEEE Transactions on Robotics and Automation, 14(3), 365–378. https://doi.org/10.1109/70.678447 Mosley, S. A., Teyner, T., & Uzsoy, R. M. (1998). Maintenance scheduling and staffing policies in a wafer fabrication facility. IEEE Transactions on Semiconductor Manufacturing, 11(2), 316–323. https://doi.org/10.1109/66.670182 O’Donovan, R., McKay, K. N., & Uzsoy, R. (1998, April). Predictable Scheduling of a Single Machine with Breakdowns and Sensitive Jobs. Presented at the INFORMS National Meeting, Montreal, Canada. Rardin, R. L., & Uzsoy, R. (1998, April). Empirical Evaluation of Heuristics: A Tutorial. Presented at the INFORMS National Meeting, Montreal, Canada. Roise, J. P. (1998, October 25). A Tactical Level Approach to Lumber Manufacturing Decisions: use of a Computer-Aided Sawing Pattern Design Program. Presented at the INFORMS National Conference, Seattle, WA. Teyner, T., & Uzsoy, R. (1998, May). Management of Spare Parts Inventories in a Wafer Fabrication Facility. Presented at the Harris Semiconductor, Melbourne, FL. Toktay, L. B., & Uzsoy, R. (1998). A capacity allocation problem with integer side constraints. European Journal of Operational Research, 109(1), 170–182. https://doi.org/10.1016/s0377-2217(98)80011-8 Uzsoy, R. (1998, April). A Senior Design Course with Industrial Experience. Presented at the Central Indiana Chapter, Institute of Industrial Engineers. Uzsoy, R. (1998, November). Maintenance Management Problems in a Semiconductor Wafer Fabrication Facility. Presented at the Department of Industrial Engineering, Texas A&M University. Uzsoy, R., & Mehta, S. V. (1998, March). Predictable Scheduling of Job Shops Subject To Machine Breakdowns. Presented at the School of Chemical Engineering, Purdue University. Uzsoy, R., & Venkatachalam, G. (1998). Supply Chain Management for Companies with Product Recovery and Remanufacturing Capability. International Journal of Environmentally Conscious Design and Manufacturing, 7, 59–72.