Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 145(12).
author keywords: Construction; Scheduling; Critical path method; Last planner system; Location-based systems
TL;DR:
The most relevant systems used for project management (PM) and project production management (PPM) in the planning and control phases are critical path method (CPM), last pPM (last path method), and project management system (PMS).
(via Semantic Scholar)
![UN Sustainable Development Goals Color Wheel](/assets/un-sdg/SDG-Wheel_WEB-small-9baffff2694056ba5d79cdadadac07d345a206e13477bd1034bd8925f38f3c4b.png)
UN Sustainable Development Goal Categories
9. Industry, Innovation and Infrastructure
(Web of Science; OpenAlex)
17. Partnerships for the Goals
(Web of Science)
Source: Web Of Science
Added: October 28, 2019
AbstractIn construction, the most relevant systems used for project management (PM) and project production management (PPM) in the planning and control phases are critical path method (CPM), last p...