Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 145(12).

author keywords: Construction; Scheduling; Critical path method; Last planner system; Location-based systems
TL;DR: The most relevant systems used for project management (PM) and project production management (PPM) in the planning and control phases are critical path method (CPM), last pPM (last path method), and project management system (PMS). (via Semantic Scholar)
UN Sustainable Development Goal Categories
Source: Web Of Science
Added: October 28, 2019

AbstractIn construction, the most relevant systems used for project management (PM) and project production management (PPM) in the planning and control phases are critical path method (CPM), last p...