Min Liu Hosseini, S. A. A., Howell, G., & Liu, M. (2016). Relationship between On-Site Planning Efforts and Work Plan Reliability. Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan, 2129–2138. Abbasian-Hosseini, S. A., Liu, M., & Hsiang, S. (2015). Social network analysis for construction specialty trade interference and work plan reliability. International Group for Lean Construction, 143–152. Russell, M. M., Hsiang, S. M., Liu, M., & Wambeke, B. (2014). Causes of time buffer and duration variation in construction project tasks: Comparison of perception to reality. Journal of Construction Engineering and Management, 140(6). Abbasian-Hosseini, S. A., Hsiang, S. M., Leming, M. L., & Liu, M. (2014). From Social Network to Data Envelopment Analysis: Identifying Benchmarks at the Site Management Level. Journal of Construction Engineering and Management, 140(8), 04014028. https://doi.org/10.1061/(asce)co.1943-7862.0000875 Wambeke, B. W., Liu, M., & Hsiang, S. M. (2014). Task variation and the social network of construction trades. Journal of Management in Engineering, 30(4). Russell, M. M., Howell, G., Hsiang, S. M., & Liu, M. (2013). Application of time buffers to construction project task durations. Journal of Construction Engineering and Management, 139(10). Vaughan, J. L., Leming, M. L., Liu, M., & Jaselskis, E. (2013). Cost-Benefit Analysis of Construction Information Management System Implementation: Case Study. Journal of Construction Engineering and Management, 139(4), 445–455. https://doi.org/10.1061/(asce)co.1943-7862.0000611 Hollar, D. A., Rasdorf, W., Liu, M., Hummer, J. E., Arocho, I., & Hsiang, S. M. (2013). Preliminary Engineering Cost Estimation Model for Bridge Projects. Journal of Construction Engineering and Management, 139(9), 1259–1267. https://doi.org/10.1061/(asce)co.1943-7862.0000668 Liu, M., Rasdorf, W., Hummer, J. E., Hollar, D. A., & Parikh, S. C. (2013). Preliminary Engineering Cost-Estimation Strategy Assessment for Roadway Projects. Journal of Management in Engineering, 29(2), 150–157. https://doi.org/10.1061/(asce)me.1943-5479.0000137 Wang, C., Liu, M., Hsiang, S. M., & Leming, M. L. (2012). Causes and Penalties of Variation: Case Study of a Precast Concrete Slab Production Facility. Journal of Construction Engineering and Management, 138(6), 775–785. https://doi.org/10.1061/(asce)co.1943-7862.0000475 Hajifathalian, K., Wambeke, B. W., Liu, M., & Hsiang, S. M. (2012). Effects of production control strategy and duration variance on productivity and work in process: Simulation-based investigation. Journal of Construction Engineering and Management, 138(9), 1035–1043. Xiang, N. S., Hsiang, S. M., Ibbs, W., & Liu, M. (2012). Identification of PDRI factors affecting changes. Proceedings of 2012 International Conference on Construction & Real Estate Management, vols 1 and 2, 282–287. Hosseini, S. A. A., Liu, M., & Hsiang, S. M. (2012). Informal decision making for construction projects inspired by flocks of birds. Proceedings of 2012 International Conference on Construction & Real Estate Management, vols 1 and 2, 277–281. Wang, Y. H., & Liu, M. (2012). Prices of highway resurfacing projects in economic downturn: Lessons learned and strategies forward. Journal of Management in Engineering, 28(4), 391–397. Russell, M. M., Wambeke, B. W., Hsiang, S. M., & Liu, M. (2012). Time buffer and variation in construction project tasks: comparing perception to reality. Proceedings of 2012 International Conference on Construction & Real Estate Management, vols 1 and 2, 303–309. Wambeke, B. W., Liu, M., & Hsiang, S. M. (2012). Using last planner and a risk assessment matrix to reduce variation in mechanical related construction tasks. Journal of Construction Engineering and Management, 138(4), 491–498. Wambeke, B. W., Liu, M., & Hsiang, S. M. (2012). Using pajek and centrality analysis to identify a social network of construction trades. Journal of Construction Engineering and Management, 138(10), 1192–1201. Lai, D. N. C., Liu, M., & Ling, F. Y. Y. (2011). A comparative study on adopting human resource practices for safety management on construction projects in the United States and Singapore. International Journal of Project Management, 29(8), 1018–1032. Ibbs, W., & Liu, M. (2011). An improved methodology for selecting similar working days for measured mile analysis. International Journal of Project Management, 29(6), 773–780. Wambeke, B. W., Hsiang, S. M., & Liu, M. (2011). Causes of Variation in Construction Project Task Starting Times and Duration. Journal of Construction Engineering and Management, 137(9), 663–677. https://doi.org/10.1061/(asce)co.1943-7862.0000342 Liu, M., Ballard, G., & Ibbs, W. (2011). Work flow variation and labor productivity: Case study. Journal of Management in Engineering, 27(4), 236–242. Hollar, D., Arocho, I., Hummer, J., Liu, M., & Rasdorf, W. (2010). Development of a regression model to predict preliminary engineering costs. ITE 2010 Technical Conference and Exhibit compendium of technical papers. Washington, D.C. : Institute of Transportation Engineers. Ling, F. Y. Y., Liu, M., & Woo, Y. C. (2009). Construction fatalities in Singapore. International Journal of Project Management, 27(7), 717–726. https://doi.org/10.1016/j.ijproman.2008.11.002