Amy D. Wilson Wilson, A. D., King, R. E., & Wilson, J. R. (2004). Case study on statistically estimating minimum makespan for flow line scheduling problems. European Journal of Operational Research, 155(2), 439–454. https://doi.org/10.1016/S0377-2217(02)00910-4 Wilson, A. D., King, R. E., & Hodgson, T. (2004). Scheduling non-similar groups on a flow line: multiple group setups. Robotics and Computer-Integrated Manufacturing, 20(6), 505–515. https://doi.org/10.1016/j.reim.2004.07.002 Thoney, K. A., Hodgson, T. J., King, R. E., Taner, M. R., & Wilson, A. D. (2002). Satisfying due-dates in large multi-factory supply chains. IIE TRANSACTIONS, 34(9), 803–811. https://doi.org/10.1080/07408170208928913