Works (23)

2014 | journal article

The relevance of the "alphorn of uncertainty" to the financial management of projects under uncertainty

European Journal of Operational Research, 238(1), 65–76.

By: J. Zhang & S. Elmaghraby

Source: NC State University Libraries

2010 | journal article

Polynomial time algorithms for two special classes of the proportionate multiprocessor open shop

European Journal of Operational Research, 201(3), 720–728.

By: M. Matta & S. Elmaghraby

Source: NC State University Libraries

2009 | journal article

elm Optimal resource allocation in stochastic activity networks via the electromagnetism approach: a platform implementation in Java

Control and Cybernetics, 38(3), 745–782.

By: A. Tereso, R. Novais, M. Araujo & S. Elmaghraby

Source: NC State University Libraries

2006 | journal article

Scheduling of a two-machine flowshop with availability constraints on the first machine

International Journal of Production Economics, 99(38354), 16–27.

By: H. Allaoui, A. Artiba, S. Elmaghraby & F. Riane

Source: NC State University Libraries

2006 | journal article

Sequencing precedence-related jobs on two machines to minimize the weighted completion time

International Journal of Production Economics, 100(1), 44–58.

By: G. Ramachandra & S. Elmaghraby

Source: NC State University Libraries

2005 | journal article

On the fallacy of averages in project risk management

European Journal of Operational Research, 165(2), 307–313.

By: S. Elmaghraby

Source: NC State University Libraries

2004 | journal article

Adaptive resource allocation in multimodal activity networks

International Journal of Production Economics, 92(1), 10-.

By: A. Tereso, M. Araujo & S. ElMaghraby

Source: NC State University Libraries

2004 | journal article

IEPM: Focus on scheduling

European Journal of Operational Research, 161(1), 02-.

By: A. Artiba & S. Elmaghraby

Source: NC State University Libraries

2003 | journal article

Sequencing on two-stage hybrid flowshops with uniform machines to minimize makespan

IIE Transactions, 35(5), 467–477.

By: H. Soewandi & S. Elmaghraby

Source: NC State University Libraries

2002 | journal article

Scheduling hybrid flowshops in printed circuit board assembly lines

Production and Operations Management, 11(2), 216–230.

By: Z. Jin, K. Ohno, T. Ito & S. Elmaghraby

Source: NC State University Libraries

2002 | journal article

Sequencing a hybrid two-stage flowshop with dedicated machines

International Journal of Production Research, 40(17), 4353–4380.

By: F. Riane, A. Artiba & S. Elmaghraby

Source: NC State University Libraries

2001 | journal article

Chance-constrained programming in activity networks: A critical evaluation

European Journal of Operational Research, 131(2), 440–458.

By: S. Elmaghraby, H. Soewandi & M. Yao

Source: NC State University Libraries

2001 | journal article

On computing the distribution function of the sum of independent random variables

Computers & Operations Research, 28(5), 473–483.

By: M. Agrawal & S. Elmaghraby

Source: NC State University Libraries

2001 | journal article

On the optimal release time of jobs with random processing times, with extensions to other criteria

International Journal of Production Economics, 74(1-3), 103–113.

By: S. Elmaghraby

Source: NC State University Libraries

2001 | journal article

Sequencing three-stage flexible flowshops with identical machines to minimize makespan

IIE Transactions, 33(11), 985–993.

By: H. Soewandi & S. Elmaghraby

Source: NC State University Libraries

2001 | journal article

The economic lot scheduling problem under power-of-two policy

Computers & Mathematics With Applications, 41(10-11), 1379–1393.

By: M. Yao & S. Elmaghraby

Source: NC State University Libraries

2000 | journal article

On criticality and sensitivity in activity networks

European Journal of Operational Research, 127(2), 220–238.

By: S. Elmaghraby

Source: NC State University Libraries

2000 | journal article

Optimal start times under stochastic activity durations

International Journal of Production Economics, 64(1-3), 153–164.

By: S. Elmaghraby, A. Ferreira & L. Tavares

Source: NC State University Libraries

1999 | journal article

On the sensitivity of project variability to activity mean duration

International Journal of Production Economics, 62(3), 219–232.

By: S. Elmaghraby, Y. Fathi & M. Taner

Source: NC State University Libraries

1999 | journal article

The two-machine stochastic flowshop problem with arbitrary processing time distributions

IIE Transactions, 31(5), 467–477.

By: S. Elmaghraby & K. Thoney

Sources: ORCID, NC State University Libraries

1999 | journal article

An optimal assembly mode of multi-type printed circuit boards

Computers & Industrial Engineering, 36(2), 451–471.

By: K. Ohno, Z. Jin & S. Elmaghraby

Source: NC State University Libraries

1998 | journal article

Call admission control schemes and ATM network topological design

European Journal of Operational Research, 111(2), 393–404.

By: S. Lo, B. Makrucki, G. Bilbro & S. Elmaghraby

Source: NC State University Libraries

1978 | journal article

Economic lot scheduling problem (elsp) - review and extensions

Management Science, 24(6), 587–598.

By: S. Elmaghraby

Source: NC State University Libraries