Salah E. Elmaghraby
Works (23)
2014 journal article
The relevance of the "alphorn of uncertainty" to the financial management of projects under uncertainty
European Journal of Operational Research, 238(1), 65–76.
2009 journal article
Polynomial time algorithms for two special classes of the proportionate multiprocessor open shop
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 201(3), 720–728.
2009 journal article
elm Optimal resource allocation in stochastic activity networks via the electromagnetism approach: a platform implementation in Java
Control and Cybernetics, 38(3), 745–782.
2005 article
Scheduling of a two-machine flowshop with availability constraints on the first machine
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, Vol. 99, pp. 16–27.
2005 journal article
Sequencing precedence-related jobs on two machines to minimize the weighted completion time
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 100(1), 44–58.
2004 journal article
Adaptive resource allocation in multimodal activity networks
International Journal of Production Economics, 92(1), 10-.
2004 journal article
IEPM: Focus on scheduling
European Journal of Operational Research, 161(1), 02-.
2004 article
On the fallacy of averages in project risk management
Elmaghraby, S. E. (2005, September 1). EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol. 165, pp. 307–313.
2003 journal article
Sequencing on two-stage hybrid flowshops with uniform machines to minimize makespan
IIE Transactions, 35(5), 467–477.
2002 journal article
Scheduling hybrid flowshops in printed circuit board assembly lines
Production and Operations Management, 11(2), 216–230.
2002 article
Sequencing a hybrid two-stage flowshop with dedicated machines
Riane, F., Artiba, A., & Elmaghraby, S. E. (2002, November 20). INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol. 40, pp. 4353–4380.
2001 journal article
Chance-constrained programming in activity networks: A critical evaluation
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 131(2), 440–458.
2001 journal article
On computing the distribution function of the sum of independent random variables
Computers & Operations Research, 28(5), 473–483.
2001 article
On the optimal release time of jobs with random processing times, with extensions to other criteria
Elmaghraby, S. E. (2001, December 1). INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, Vol. 74, pp. 103–113.
2001 journal article
Sequencing three-stage flexible flowshops with identical machines to minimize makespan
IIE TRANSACTIONS, 33(11), 985–993.
2001 journal article
The economic lot scheduling problem under power-of-two policy
COMPUTERS & MATHEMATICS WITH APPLICATIONS, 41(10-11), 1379–1393.
2000 article
On criticality and sensitivity in activity networks
Elmaghraby, S. E. (2000, December 1). EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol. 127, pp. 220–238.
2000 journal article
Optimal start times under stochastic activity durations
International Journal of Production Economics, 64(1-3), 153–164.
1999 journal article
An optimal assembly mode of multi-type printed circuit boards
COMPUTERS & INDUSTRIAL ENGINEERING, 36(2), 451–471.
1999 journal article
On the sensitivity of project variability to activity mean duration
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 62(3), 219–232.
1999 journal article
The two-machine stochastic flowshop problem with arbitrary processing time distributions
IIE Transactions, 31(5), 467–477.
1998 journal article
Call admission control schemes and ATM network topological design
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 111(2), 393–404.
1978 journal article
ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS
MANAGEMENT SCIENCE, 24(6), 587–598.