Salah E. Elmaghraby Zhang, J. W., & Elmaghraby, S. E. (2014). The relevance of the "alphorn of uncertainty" to the financial management of projects under uncertainty. European Journal of Operational Research, 238(1), 65–76. Matta, M. E., & Elmaghraby, S. E. (2010). Polynomial time algorithms for two special classes of the proportionate multiprocessor open shop. European Journal of Operational Research, 201(3), 720–728. https://doi.org/10.1016/j.ejor.2009.03.048 Tereso, A. P., Novais, R. A., Araujo, M. M. T., & Elmaghraby, S. E. (2009). elm Optimal resource allocation in stochastic activity networks via the electromagnetism approach: a platform implementation in Java. Control and Cybernetics, 38(3), 745–782. Allaoui, H., Artiba, A., Elmaghraby, S. E., & Riane, F. (2006). Scheduling of a two-machine flowshop with availability constraints on the first machine. International Journal of Production Economics, 99(38354), 16–27. https://doi.org/10.1016/j.ijpe.2004.12.003 Ramachandra, G., & Elmaghraby, S. E. (2006). Sequencing precedence-related jobs on two machines to minimize the weighted completion time. International Journal of Production Economics, 100(1), 44–58. https://doi.org/10.1016/j.ijpe.2004.10.014 Elmaghraby, S. E. (2005). On the fallacy of averages in project risk management. European Journal of Operational Research, 165(2), 307–313. https://doi.org/10.1016/j.ejor.2004.04.003 Tereso, A. P., Araujo, M. M. T., & ElMaghraby, S. E. (2004). Adaptive resource allocation in multimodal activity networks. International Journal of Production Economics, 92(1), 10-. Artiba, A., & Elmaghraby, S. E. (2004). IEPM: Focus on scheduling. European Journal of Operational Research, 161(1), 02-. Soewandi, H., & Elmaghraby, S. E. (2003). Sequencing on two-stage hybrid flowshops with uniform machines to minimize makespan. IIE Transactions, 35(5), 467–477. https://doi.org/10.1080/07408170390187915 Jin, Z. H., Ohno, K., Ito, T., & Elmaghraby, S. E. (2002). Scheduling hybrid flowshops in printed circuit board assembly lines. Production and Operations Management, 11(2), 216–230. Riane, F., Artiba, A., & Elmaghraby, S. E. (2002). Sequencing a hybrid two-stage flowshop with dedicated machines. International Journal of Production Research, 40(17), 4353–4380. https://doi.org/10.1080/00207540210159536 Elmaghraby, S. E., Soewandi, H., & Yao, M. J. (2001). Chance-constrained programming in activity networks: A critical evaluation. European Journal of Operational Research, 131(2), 440–458. https://doi.org/10.1016/S0377-2217(00)00086-2 Agrawal, M. K., & Elmaghraby, S. E. (2001). On computing the distribution function of the sum of independent random variables. Computers & Operations Research, 28(5), 473–483. Elmaghraby, S. E. (2001). On the optimal release time of jobs with random processing times, with extensions to other criteria. International Journal of Production Economics, 74(1-3), 103–113. https://doi.org/10.1016/S0925-5273(01)00111-6 Soewandi, H., & Elmaghraby, S. E. (2001). Sequencing three-stage flexible flowshops with identical machines to minimize makespan. IIE Transactions, 33(11), 985–993. https://doi.org/10.1023/A:1010934318497 Yao, M. J., & Elmaghraby, S. E. (2001). The economic lot scheduling problem under power-of-two policy. Computers & Mathematics With Applications, 41(10-11), 1379–1393. https://doi.org/10.1016/S0898-1221(01)00103-1 Elmaghraby, S. E. (2000). On criticality and sensitivity in activity networks. European Journal of Operational Research, 127(2), 220–238. https://doi.org/10.1016/S0377-2217(99)00483-X Elmaghraby, S. E., Ferreira, A. A., & Tavares, L. V. (2000). Optimal start times under stochastic activity durations. International Journal of Production Economics, 64(1-3), 153–164. Ohno, K., Jin, Z. H., & Elmaghraby, S. E. (1999). An optimal assembly mode of multi-type printed circuit boards. Computers & Industrial Engineering, 36(2), 451–471. https://doi.org/10.1016/S0360-8352(99)00142-4 Elmaghraby, S. E., Fathi, Y., & Taner, M. R. (1999). On the sensitivity of project variability to activity mean duration. International Journal of Production Economics, 62(3), 219–232. https://doi.org/10.1016/S0925-5273(98)00241-2 Elmaghraby, S. E., & Thoney, K. A. (1999). The two-machine stochastic flowshop problem with arbitrary processing time distributions. IIE Transactions, 31(5), 467–477. https://doi.org/10.1023/A:1007697625481 Lo, S. Z., Makrucki, B. A., Bilbro, G. L., & Elmaghraby, S. E. (1998). Call admission control schemes and ATM network topological design. European Journal of Operational Research, 111(2), 393–404. https://doi.org/10.1016/S0377-2217(97)00320-2 Elmaghraby, S. E. (1978). Economic lot scheduling problem (elsp) - review and extensions. Management Science, 24(6), 587–598. https://doi.org/10.1287/mnsc.24.6.587