Salah E. Elmaghraby Zhang, J. W., & Elmaghraby, S. E. (2014). The relevance of the "alphorn of uncertainty" to the financial management of projects under uncertainty. European Journal of Operational Research, 238(1), 65–76. Matta, M. E., & Elmaghraby, S. E. (2010). Polynomial time algorithms for two special classes of the proportionate multiprocessor open shop. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 201(3), 720–728. https://doi.org/10.1016/j.ejor.2009.03.048 Tereso, A. P., Novais, R. A., Araujo, M. M. T., & Elmaghraby, S. E. (2009). elm Optimal resource allocation in stochastic activity networks via the electromagnetism approach: a platform implementation in Java. Control and Cybernetics, 38(3), 745–782. Allaoui, H., Artiba, A., Elmaghraby, S. E., & Riane, F. (2006). Scheduling of a two-machine flowshop with availability constraints on the first machine. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, Vol. 99, pp. 16–27. https://doi.org/10.1016/j.ijpe.2004.12.003 Ramachandra, G., & Elmaghraby, S. E. (2006). Sequencing precedence-related jobs on two machines to minimize the weighted completion time. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 100(1), 44–58. https://doi.org/10.1016/j.ijpe.2004.10.014 Elmaghraby, S. E. (2005, September 1). On the fallacy of averages in project risk management. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol. 165, pp. 307–313. https://doi.org/10.1016/j.ejor.2004.04.003 Tereso, A. P., Araujo, M. M. T., & ElMaghraby, S. E. (2004). Adaptive resource allocation in multimodal activity networks. International Journal of Production Economics, 92(1), 10-. Artiba, A., & Elmaghraby, S. E. (2004). IEPM: Focus on scheduling. European Journal of Operational Research, 161(1), 02-. Soewandi, H., & Elmaghraby, S. E. (2003). Sequencing on two-stage hybrid flowshops with uniform machines to minimize makespan. IIE Transactions, 35(5), 467–477. https://doi.org/10.1080/07408170390187915 Jin, Z. H., Ohno, K., Ito, T., & Elmaghraby, S. E. (2002). Scheduling hybrid flowshops in printed circuit board assembly lines. Production and Operations Management, 11(2), 216–230. Riane, F., Artiba, A., & Elmaghraby, S. E. (2002, November 20). Sequencing a hybrid two-stage flowshop with dedicated machines. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol. 40, pp. 4353–4380. https://doi.org/10.1080/00207540210159536 Elmaghraby, S. E., Soewandi, H., & Yao, M. J. (2001). Chance-constrained programming in activity networks: A critical evaluation. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 131(2), 440–458. https://doi.org/10.1016/S0377-2217(00)00086-2 Agrawal, M. K., & Elmaghraby, S. E. (2001). On computing the distribution function of the sum of independent random variables. Computers & Operations Research, 28(5), 473–483. Elmaghraby, S. E. (2001, December 1). On the optimal release time of jobs with random processing times, with extensions to other criteria. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, Vol. 74, pp. 103–113. https://doi.org/10.1016/S0925-5273(01)00111-6 Soewandi, H., & Elmaghraby, S. E. (2001). Sequencing three-stage flexible flowshops with identical machines to minimize makespan. IIE TRANSACTIONS, 33(11), 985–993. https://doi.org/10.1023/A:1010934318497 Yao, M. J., & Elmaghraby, S. E. (2001). The economic lot scheduling problem under power-of-two policy. COMPUTERS & MATHEMATICS WITH APPLICATIONS, 41(10-11), 1379–1393. https://doi.org/10.1016/S0898-1221(01)00103-1 Elmaghraby, S. E. (2000, December 1). On criticality and sensitivity in activity networks. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol. 127, pp. 220–238. https://doi.org/10.1016/S0377-2217(99)00483-X Elmaghraby, S. E., Ferreira, A. A., & Tavares, L. V. (2000). Optimal start times under stochastic activity durations. International Journal of Production Economics, 64(1-3), 153–164. Ohno, K., Jin, Z. H., & Elmaghraby, S. E. (1999). An optimal assembly mode of multi-type printed circuit boards. COMPUTERS & INDUSTRIAL ENGINEERING, 36(2), 451–471. https://doi.org/10.1016/S0360-8352(99)00142-4 Elmaghraby, S. E., Fathi, Y., & Taner, M. R. (1999). On the sensitivity of project variability to activity mean duration. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 62(3), 219–232. https://doi.org/10.1016/S0925-5273(98)00241-2 Elmaghraby, S. E., & Thoney, K. A. (1999). The two-machine stochastic flowshop problem with arbitrary processing time distributions. IIE Transactions, 31(5), 467–477. https://doi.org/10.1023/A:1007697625481 Lo, S. Z., Makrucki, B. A., Bilbro, G. L., & Elmaghraby, S. E. (1998). Call admission control schemes and ATM network topological design. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 111(2), 393–404. https://doi.org/10.1016/S0377-2217(97)00320-2 ELMAGHRABY, S. E. (1978). ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS. MANAGEMENT SCIENCE, 24(6), 587–598. https://doi.org/10.1287/mnsc.24.6.587