Thom Hodgson Slocum, R. F., Jones, H. L., Fletcher, M. T., McConnell, B. M., Hodgson, T. J., Taheri, J., & Wilson, J. R. (2020). Improving chemotherapy infusion operations through the simulation of scheduling heuristics: a case study. Health Systems, 2, 1–16. https://doi.org/10.1080/20476965.2019.1709908 Kearby, J. A., Winz, R. D., Hodgson, T. J., Kay, M. G., King, R. E., & McConnell, B. M. (2020). Modeling and transportation planning for US noncombatant evacuation operations in South Korea. Journal of Defense Analytics and Logistics, 4(1), 41–69. https://doi.org/10.1108/JDAL-05-2019-0010 Rogers, M. B., McConnell, B. M., Hodgson, T. J., Kay, M. G., King, R. E., Parlier, G., & Thoney Barletta, K. (2018). A Military Logistics Network Planning System. Military Operations Research, 23(4), 5–24. https://doi.org/10.5711/1082598323405 Karagul, H. F., Warsing, D. P., Hodgson, T. J., Kapadia, M. S., & Uzsoy, R. (2018). A comparison of mixed integer programming formulations of the capacitated lot-sizing problem. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 56(23), 7064–7084. https://doi.org/10.1080/00207543.2017.1401232 Kim, G., Hodgson, T. J., King, R. E., Liu, Y. N., & Kay, M. G. (2017). Allocation heuristics for high-altitude long- endurance UAV image intelligence platforms. Military Operations Research, 22(3), 5–19. Hanson, B. B., Hodgson, T. J., Kay, M. G., King, R. E., & Thoney-Barletta, K. A. (2015). On the economic lot scheduling problem: stock-out prevention and system feasibility. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 53(16), 4903–4916. https://doi.org/10.1080/00207543.2015.1005246 Lobo, B. J., Wilson, J. R., Thoney, K. A., Hodgson, T. J., & King, R. E. (2014). A practical method for evaluating worker allocations in large-scale dual resource constrained job shops. IIE Transactions, 46(11), 1209–1226. https://doi.org/10.1080/0740817X.2014.892231 Lobo, B. J., Hodgson, T. J., King, R. E., Thoney, K. A., & Wilson, J. R. (2013). Allocating job-shop manpower to minimize : Optimality criteria, search heuristics, and probabilistic quality metrics. Computers & Operations Research, 40(10), 2569–2584. https://doi.org/10.1016/J.COR.2013.02.008 Lobo, B. J., Hodgson, T. J., King, R. E., Thoney, K. A., & Wilson, J. R. (2013). An effective lower bound on Lmax in a worker-constrained job shop. Computers & Operations Research, 40(1), 328–343. https://doi.org/10.1016/j.cor.2012.07.003 Davis, L. B., King, R. E., Hodgson, T. J., & Wei, W. (2011). Information sharing in capacity constrained supply chains under lost sales. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 49(24), 7469–7491. https://doi.org/10.1080/00207543.2010.535037 Davis, L. B., Hodgson, T. J., King, R. E., & Wei, W. (2009). Technical Note: A Computationally Efficient Algorithm for Undiscounted Markov Decision Processes with Restricted Observations. NAVAL RESEARCH LOGISTICS, 56(1), 86–92. https://doi.org/10.1002/nav.20329 Taner, M. R., Hodgson, T. J., King, R. E., & Schultz, S. R. (2007). Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structure. COMPUTERS & INDUSTRIAL ENGINEERING, 52(1), 57–70. https://doi.org/10.1016/j.cie.2006.10.008 Stanfield, P. M., King, R. E., & Hodgson, T. J. (2006). Determining sequence and ready times in a remanufacturing system. IIE TRANSACTIONS, 38(7), 597–607. https://doi.org/10.1080/07408170500371830 Laoboonlur, P., Hodgson, T., & Thoney, K. A. (2006). Production scheduling in a knitted fabric dyeing and finishing process. Journal of the Textile Institute, 97(5), 391–399. https://doi.org/10.1533/joti.2005.0145 Hodgson, T. J., Jackson, S. D., Qu, P., & Cannon, R. E. (2004). A material allocation scheme for optical fibre cable manufacturing: a case study. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 42(16), 3271–3279. https://doi.org/10.1080/00207540410001688400 Schultz, SR, Hodgson, T. J., King, R. E., & Thoney, K. A. (2004). Minimizing L-max for large-scale, job-shop scheduling problems. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 42(23), 4893–4907. https://doi.org/10.1080/00207540410001721754 Schultz, SR, Hodgson, T. J., King, R. E., & Taner, M. R. (2004). Minimizing L-max for the single machine scheduling problem with family set-ups. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 42(20), 4315–4330. https://doi.org/10.1080/00207540410001716561 Wilson, A. D., King, R. E., & Hodgson, T. (2004). Scheduling non-similar groups on a flow line: multiple group setups. Robotics and Computer-Integrated Manufacturing, 20(6), 505–515. https://doi.org/10.1016/j.reim.2004.07.002 Wilson, A. D., King, R. E., & Hodgson, T. J. (2004). Scheduling non-similar groups on a flow line: multiple group setups. Robotics and Computer-Integrated Manufacturing, 20(6), 505–515. https://doi.org/10.1016/j.rcim.2004.07.002 Hodgson, T., Melendez, B., & Trainor, T. (2004). The deployment scheduling analysis tool (DSAT). Mathematical and Computer Modelling, 39(08-Jun), 905–924. https://doi.org/10.1016/j.mcm.2004.02.021 Hodgson, T. J., Melendez, B., Thoney, K. A., & Trainor, T. (2004). The deployment scheduling analysis tool (DSAT). Mathematical and Computer Modelling, 39(6-8), 905–924. https://doi.org/10.1016/s0895-7177(04)90561-4 Zozom, A., Hodgson, T. J., King, R. E., Weintraub, A. J., & Cormier, D. (2003). Integrated job release and shop-floor scheduling to minimize WIP and meet due-dates. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 41(1), 31–45. https://doi.org/10.1080/00207540210162992 Taner, M. R., Hodgson, T. J., King, R. E., & Thoney, K. A. (2003). Satisfying due-dates in a job shop with sequence-dependent family set-ups. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 41(17), 4153–4169. https://doi.org/10.1080/0020754031000149167 Thoney, K. A., Hodgson, T. J., King, R. E., Taner, M. R., & Wilson, A. D. (2002). Satisfying due-dates in large multi-factory supply chains. IIE TRANSACTIONS, 34(9), 803–811. https://doi.org/10.1080/07408170208928913 Yaghubian, A. R., Hodgson, T. J., & Joines, J. A. (2001). Dry-or-buy decision support for dry kiln scheduling in furniture production. IIE Transactions, 33(2), 131–136. https://doi.org/10.1023/A:1007603002606 Yaghubian, A. R., Hodgson, T. J., Joines, J. A., Culbreth, C. T., & Huang, J. C. (1999). Dry kiln scheduling in furniture production. IIE Transactions, 31(8), 733–738. https://doi.org/10.1080/07408179908969872 Hodgson, T., Kay, M. G., Mittal, R. O., & Tang, S. Y. (1999). Evaluation of cylindricity using combinatorics. IIE Transactions, 31(1), 39–47. https://doi.org/10.1080/07408179908969804 Hodgson, T., King, R. E., Thoney, K., Stanislaw, N., Weintraub, A. J., & Zozom, A. (1999). On satisfying due-dates in large job shops: Idle time insertion. IIE Transactions, 32(2), 177–180. https://doi.org/10.1080/07408170008963890 Weintraub, A., Cormier, D., Hodgson, T., King, R., Wilson, J., & Zozom, A. (1999). Scheduling with alternatives: a link between process planning and scheduling. IIE Transactions, 31(11), 1093–1102. https://doi.org/10.1080/07408179908969910 Wang, D. W., Fang, S. C., & Hodgson, T. J. (1998). A fuzzy due-date bargainer for the make-to-order manufacturing systems. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 28(3), 492–497. https://doi.org/10.1109/5326.704596 Huang, J. C. C., Culbreth, C. T., Joines, J. A., King, R. E., & Hodgson, T. J. (1998). Decision support system for lumber procurement and dry kiln scheduling. Forest Products Journal, 48(9), 51–59. Hodgson, T. J., Cormier, D., Weintraub, A. J., & Zozom, A. (1998). Note. Satisfying due dates in large job shops. MANAGEMENT SCIENCE, 44(10), 1442–1446. https://doi.org/10.1287/mnsc.44.10.1442 Hodgson, T. J., King, R. E., & Stanfield, P. M. (1997). Ready-time scheduling with stochastic service times. OPERATIONS RESEARCH, 45(5), 779–783. https://doi.org/10.1287/opre.45.5.779